Dachaigh › Luchd-obrach › S&ME Inc.
S&ME Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir S&ME Inc. 27 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 27. Tuarastal meadhanach a chaidh a thabhann: $72,093.
A bheil S&ME Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir S&ME Inc. 27 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 22 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig S&ME Inc.: 3 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Staff Professional I | 4 | $64,563 |
| Staff Professional II | 4 | $68,500 |
| Professional I-Engineering | 3 | $74,006 |
| Project Manager | 2 | $111,294 |
| Construction Engineering Technician IV | 2 | $67,038 |
| Professional II-Engineering | 2 | $68,994 |
| Senior Environmental Technician | 1 | $58,240 |
| Construction Services Quality Assurance/Laboratory Supvr | 1 | $85,000 |
| Project Engineer II – Project Manager | 1 | $105,000 |
| Professional III-Engineering | 1 | $95,000 |
| Project Engineer I | 1 | $75,067 |
| Project Engineer I, Team Lead I | 1 | $85,000 |
| Project Engineer II | 1 | $121,000 |
| Project Engineer/Team Lead/Project Manager | 1 | $85,000 |
| Professional II Engineer | 1 | $72,093 |
| Professional II Geology | 1 | $75,005 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 7 | $65,390 |
| FY2024 | 5 | $70,000 |
| FY2025 | 10 | $74,536 |
| FY2026 | 5 | $75,005 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Charlotte, NC4
- Spartanburg, SC4
- Nashville, TN3
- Raleigh, NC3
- Indianapolis, IN3
- Dublin, OH2
- West Chester, OH2
- Westchester, OH2
- Greensboro, NC1
- Louisville, TN1
- Duluth, GA1
- Augusta, GA1
Dreuchdan
- Civil Engineers21
- Mechanical Engineers2
- Construction Managers2
- Environmental Scientists and Specialists, Including Health1
- Geoscientists, Except Hydrologists and Geographers1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Professional II Geology | $75,005 Ìre I | Charlotte, NC | 22 Gibl 2026 | 4 Cèit 2026 | Dearbhaichte |
| Professional I-Engineering | $75,005 Ìre I | Indianapolis, IN | 13 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Construction Engineering Technician IV | $66,955 Ìre I | Westchester, OH | 9 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Professional II Engineer | $72,093 Ìre I | Westchester, OH | 9 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Project Engineer/Team Lead/Project Manager | $85,000–$95,000 Ìre II | Spartanburg, SC | 4 Màrt 2026 | 9 Màrt 2026 | Dearbhaichte |
| Project Engineer II | $121,000 Ìre III | Augusta, GA | 11 Iuch 2025 | 25 Lùna 2025 | Dearbhaichte |
| Project Manager | $114,873 Ìre III | Nashville, TN | 17 Ògmh 2025 | 23 Iuch 2025 | Dearbhaichte |
| Project Engineer I | $75,067–$100,000 Ìre II | Spartanburg, SC | 9 Cèit 2025 | 25 Cèit 2025 | Dearbhaichte |
| Project Engineer I, Team Lead I | $85,000 Ìre II | Spartanburg, SC | 29 Gibl 2025 | 11 Cèit 2025 | Dearbhaichte |
| Professional I-Engineering | $67,142 Ìre I | Indianapolis, IN | 13 Màrt 2025 | 30 Lùna 2025 | Dearbhaichte |
| Construction Engineering Technician IV | $67,122 Ìre I | Charlotte, NC | 10 Màrt 2025 | 30 Lùna 2025 | Dearbhaichte |
| Professional II-Engineering | $67,995 Ìre I | Duluth, GA | 6 Màrt 2025 | 30 Lùna 2025 | Dearbhaichte |
| Professional I-Engineering | $74,006 Ìre I | Indianapolis, IN | 6 Màrt 2025 | 30 Lùna 2025 | Dearbhaichte |
| Professional II-Engineering | $69,992 Ìre I | Dublin, OH | 6 Màrt 2025 | 30 Lùna 2025 | Dearbhaichte |
| Professional III-Engineering | $95,000 Ìre II | Raleigh, NC | 27 Sult 2024 | 21 Dàmh 2024 | Dearbhaichte |
| Staff Professional II | $135,061 Ìre IV | Raleigh, NC | 12 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Staff Professional I | $64,126 Ìre I | West Chester, OH | 11 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Staff Professional II | $67,000 Ìre I | West Chester, OH | 9 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Staff Professional II | $70,000 Ìre I | Louisville, TN | 9 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer II – Project Manager | $105,000 Ìre IV | Greensboro, NC | 20 Màrt 2024 | 1 Gibl 2024 | Dearbhaichte |
| Project Manager | $107,714 Ìre III | Nashville, TN | 14 Sult 2023 | 25 Sult 2023 | Dearbhaichte |
| Staff Professional I | $62,060 Ìre I | Dublin, OH | 27 Màrt 2023 | 26 Sult 2023 | Dearbhaichte |
| Construction Services Quality Assurance/Laboratory Supvr | $85,000 Ìre II | Raleigh, NC | 27 Màrt 2023 | 26 Sult 2023 | Dearbhaichte |
| Staff Professional I | $65,390 Ìre I | Spartanburg, SC | 27 Màrt 2023 | 26 Sult 2023 | Dearbhaichte |
| Staff Professional II | $67,000 Ìre I | Charlotte, NC | 27 Màrt 2023 | 26 Sult 2023 | Dearbhaichte |
| Staff Professional I | $65,000 Ìre I | Nashville, TN | 27 Màrt 2023 | 26 Sult 2023 | Dearbhaichte |
| Senior Environmental Technician | $58,240 Ìre I | Charlotte, NC | 27 Màrt 2023 | 26 Sult 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).