Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Safeway Inc. › Staff Engineer Quality

Staff Engineer Quality aig Safeway Inc.: Tuarastalan H-1B

13 iarrtasan cumhaichean-obrach airson an dreuchd Staff Engineer Quality aig Safeway Inc.. Tuarastal bunasach meadhanach $167,626; leth meadhanach $156,750–$174,720.

Iarrtasan (LCAs)13
Tuarastal meadhanach a chaidh a thabhann$167,626
Leath mheadhanach nan tuarastalan$156,750–$174,720
Ceudail 10mh–90mh$148,580–$183,067

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20245$160,363
FY20254$168,674
FY20264$167,626

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$152,898
Ìre III
Plano, TX26 Cèit 202626 Sult 2026Dearbhaichte
$167,626
Ìre IV
Pleasanton, CA24 Gearr 202617 Ògmh 2026Dearbhaichte
$167,626
Ìre IV
Pleasanton, CA4 Gearr 202617 Ògmh 2026Dearbhaichte
$162,628
Ìre IV
Pleasanton, CA23 Cèit 202527 Cèit 2025Dearbhaichte
$183,750
Ìre IV
Pleasanton, CA16 Gibl 202529 Sult 2025Dearbhaichte
$174,720
Ìre IV
Pleasanton, CA27 Samh 202427 Gibl 2025Dearbhaichte
$132,063
Ìre IV
Phoenix, AZ19 Samh 202427 Gibl 2025Dearbhaichte
$169,260
Ìre IV
Pleasanton, CA7 Dàmh 202420 Màrt 2025Dearbhaichte, an uair sin air a tharraing air ais
$180,336
Ìre IV
Pleasanton, CA5 Lùna 202424 Dùbh 2024Dearbhaichte
$160,363
Ìre IV
Plano, TX3 Iuch 20243 Samh 2024Dearbhaichte
$183,750
Ìre IV
Pleasanton, CA25 Ògmh 202430 Sult 2024Dearbhaichte
$156,750Livermore, CA28 Gearr 202415 Iuch 2024Dearbhaichte
$147,500
Ìre IV
Plano, TX18 Faoi 202429 Faoi 2024Dearbhaichte

Obraichean eile aig Safeway Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).