Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Salesforce, Inc. › Quality Engineering LMTS

Quality Engineering LMTS aig Salesforce, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Quality Engineering LMTS aig Salesforce, Inc.. Tuarastal bunasach meadhanach $205,792; leth meadhanach $184,075–$222,682.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$205,792
Leath mheadhanach nan tuarastalan$184,075–$222,682
Ceudail 10mh–90mh$170,900–$226,046

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20245$217,686
FY20251$193,899

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$193,899
Ìre III
Dallas, TX20 Gearr 20255 Lùna 2025Dearbhaichte
$227,745
Ìre III
San Francisco, CA1 Lùna 202411 Faoi 2025Dearbhaichte
$180,800
Ìre III
Dallas, TX28 Ògmh 202428 Dùbh 2024Dearbhaichte
$224,348
Ìre IV
San Francisco, CA17 Gibl 202417 Dàmh 2024Dearbhaichte
$217,686
Ìre III
San Francisco, CA13 Màrt 202412 Sult 2024Dearbhaichte
$161,000
Ìre III
Gilbert, AZ4 Màrt 202418 Màrt 2024Dearbhaichte

Obraichean eile aig Salesforce, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).