Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Salesforce, Inc. › Quality Engineering MTS

Quality Engineering MTS aig Salesforce, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Quality Engineering MTS aig Salesforce, Inc.. Tuarastal bunasach meadhanach $145,370; leth meadhanach $134,901–$147,077.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$145,370
Leath mheadhanach nan tuarastalan$134,901–$147,077
Ceudail 10mh–90mh$131,058–$159,822

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$130,477
FY20243$147,420
FY20252$138,844

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$131,638
Ìre II
Dallas, TX6 Màrt 202513 Màrt 2025Dearbhaichte
$146,049
Ìre III
Concord, NC28 Dàmh 202425 Gibl 2025Dearbhaichte
$147,420
Ìre III
Frisco, TX15 Iuch 202431 Dùbh 2024Dearbhaichte
$172,224San Francisco, CA14 Ògmh 202410 Dùbh 2024Dearbhaichte
$144,690
Ìre II
Lake Stevens, WA27 Sult 202328 Màrt 2024Dearbhaichte
$130,477
Ìre III
Dallas, TX29 Lùna 20234 Gearr 2024Dearbhaichte

Obraichean eile aig Salesforce, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).