Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Salesforce, Inc. › Release Engineering Lead

Release Engineering Lead aig Salesforce, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Release Engineering Lead aig Salesforce, Inc.. Tuarastal bunasach meadhanach $258,225; leth meadhanach $238,770–$276,676.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$258,225
Leath mheadhanach nan tuarastalan$238,770–$276,676
Ceudail 10mh–90mh$212,458–$281,138

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20244$243,567
FY20262$281,138

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$281,138
Ìre IV
San Francisco, CA9 Dùbh 20259 Màrt 2026Dearbhaichte
$281,138
Ìre IV
San Francisco, CA12 Samh 20259 Màrt 2026Dearbhaichte
$190,944
Ìre II
Fullerton, CA28 Ògmh 202427 Dùbh 2024Dearbhaichte
$263,288
Ìre IV
San Francisco, CA18 Gibl 202414 Sult 2024Dearbhaichte
$253,162
Ìre IV
San Francisco, CA22 Màrt 202414 Sult 2024Dearbhaichte
$233,972
Ìre III
San Francisco, CA9 Dàmh 202324 Màrt 2024Dearbhaichte

Obraichean eile aig Salesforce, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).