Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Sapphirus Systems LLC › Technical Project Manager

Technical Project Manager aig Sapphirus Systems LLC: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Technical Project Manager aig Sapphirus Systems LLC. Tuarastal bunasach meadhanach $97,500; leth meadhanach $83,750–$100,975.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$97,500
Leath mheadhanach nan tuarastalan$83,750–$100,975
Ceudail 10mh–90mh$70,000–$103,150

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$100,000
FY20244$87,500
FY20251$101,300

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$101,300
Ìre I
San Jose, CA7 Dùbh 202418 Dùbh 2024Dearbhaichte
$60,000
Ìre I
Peachtree Corners, GA20 Cèit 20241 Dàmh 2024Dearbhaichte
$105,000
Ìre II
Peachtree Corners, GA28 Gearr 20241 Màrt 2024Dearbhaichte
$80,000
Ìre II
Peachtree Corners, GA15 Lùna 20231 Dàmh 2023Dearbhaichte, an uair sin air a tharraing air ais
$100,000
Ìre II
Peachtree Corners, GA4 Ògmh 20231 Dàmh 2023Dearbhaichte
$95,000
Ìre II
Peachtree Corners, GA12 Gibl 20231 Dàmh 2023Dearbhaichte, an uair sin air a tharraing air ais

Technical Project Manager aig gach neach-fastaidh →

Obraichean eile aig Sapphirus Systems LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).