Dachaigh › Luchd-obrach › Satyam Venture Engineering Services Pvt. Ltd. › Design Engineer
Design Engineer aig Satyam Venture Engineering Services Pvt. Ltd.: Tuarastalan H-1B
24 iarrtasan cumhaichean-obrach airson an dreuchd Design Engineer aig Satyam Venture Engineering Services Pvt. Ltd.. Tuarastal bunasach meadhanach $76,896; leth meadhanach $72,350–$80,000.
Iarrtasan (LCAs)24
Tuarastal meadhanach a chaidh a thabhann$76,896
Leath mheadhanach nan tuarastalan$72,350–$80,000
Ceudail 10mh–90mh$70,158–$88,600
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 6 | $72,500 |
| FY2024 | 6 | $72,079 |
| FY2025 | 7 | $80,000 |
| FY2026 | 5 | $80,000 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $77,792 Ìre I | Auburn Hills, MI | 8 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $78,000 Ìre I | Auburn Hills, MI | 3 Dùbh 2025 | 25 Cèit 2026 | Dearbhaichte |
| $91,000 Ìre I | Farmington Hills, MI | 19 Samh 2025 | 18 Gibl 2026 | Dearbhaichte |
| $80,000 Ìre I | Auburn Hills, MI | 3 Samh 2025 | 6 Gibl 2026 | Dearbhaichte |
| $80,000 Ìre I | Farmington Hills, MI | 3 Samh 2025 | 14 Gearr 2026 | Dearbhaichte |
| $91,000 Ìre II | Farmington Hills, MI | 11 Màrt 2025 | 6 Lùna 2025 | Dearbhaichte |
| $80,000 Ìre I | Farmington Hills, MI | 11 Màrt 2025 | 4 Lùna 2025 | Dearbhaichte |
| $80,000 Ìre I | Southfield, MI | 16 Dùbh 2024 | 13 Gearr 2025 | Dearbhaichte |
| $80,000 Ìre I | Auburn Hills, MI | 3 Dùbh 2024 | 20 Màrt 2025 | Dearbhaichte |
| $91,000 Ìre II | Farmington Hills, MI | 22 Dàmh 2024 | 18 Gibl 2025 | Dearbhaichte |
| $76,000 Ìre I | Farmington Hills, MI | 18 Dàmh 2024 | 20 Màrt 2025 | Dearbhaichte |
| $72,467 Ìre I | Farmington Hills, MI | 17 Dàmh 2024 | 8 Màrt 2025 | Dearbhaichte |
| $80,000 Ìre I | Auburn Hills, MI | 21 Lùna 2024 | 4 Dùbh 2024 | Dearbhaichte |
| $83,000 Ìre I | Southfield, MI | 23 Iuch 2024 | 13 Dùbh 2024 | Dearbhaichte |
| $68,000 Ìre I | Normal, IL | 27 Gearr 2024 | 27 Gearr 2024 | Dearbhaichte |
| $70,158 Ìre I | Southfield, MI | 16 Samh 2023 | 16 Samh 2023 | Dearbhaichte |
| $74,000 Ìre I | Rochester Hills, MI | 13 Samh 2023 | 10 Faoi 2024 | Dearbhaichte |
| $70,158 Ìre I | Auburn Hills, MI | 10 Samh 2023 | 10 Samh 2023 | Dearbhaichte |
| $70,158 Ìre I | Auburn Hills, MI | 27 Iuch 2023 | 27 Iuch 2023 | Dearbhaichte |
| $67,829 Ìre I | Auburn Hills, MI | 8 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $74,500 Ìre I | Farmington Hills, MI | 1 Ògmh 2023 | 30 Sult 2023 | Dearbhaichte |
| $72,000 Ìre I | Novi, MI | 3 Cèit 2023 | 3 Cèit 2023 | Dearbhaichte |
| $75,000 Ìre I | Auburn Hills, MI | 6 Gibl 2023 | 6 Gibl 2023 | Dearbhaichte |
| $73,000 Ìre I | Auburn Hills, MI | 10 Faoi 2023 | 10 Ògmh 2023 | Dearbhaichte |
Design Engineer aig gach neach-fastaidh →
Obraichean eile aig Satyam Venture Engineering Services Pvt. Ltd.
- Engineer$72,467
- Mechanical Engineer$75,000
- Electrical Engineer$85,000
- Verification and Validation Engineer$110,000
- Engineer/Mechanical Engineer$84,490
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).