Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Sequoia Services, LLC

Sequoia Services, LLC: Tuarastalan H-1B agus taic bhìosa

Chuir Sequoia Services, LLC 6 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 4. Tuarastal meadhanach a chaidh a thabhann: $84,760.

Iarrtasan (LCAs)6
Dearbhaichte4
Seòladh an neach-fhastaidhGreensboro, NC
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$84,760
Leath mheadhanach nan tuarastalan$79,053–$91,887
Ceudail 10mh–90mh$73,741–$99,755

A bheil Sequoia Services, LLC a’ toirt taic do bhìosaichean H-1B?

Chuir Sequoia Services, LLC 6 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 4 Gearr 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Quality Control Engineer3$78,858
Quality Control Manager (heavy Civil Construction)1—
Corporate Quality Manager (engineer)1$105,000
Project Engineer1$82,004

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20253$70,200
FY20263$87,516

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Project Engineer$82,004
Ìre II
Greensboro, NC4 Gearr 202623 Gearr 2026Dearbhaichte
Quality Control Engineer$87,516
Ìre II
Greensboro, NC4 Gearr 202623 Gearr 2026Dearbhaichte
Corporate Quality Manager (engineer)$105,000
Ìre III
Raleigh, NC9 Dùbh 20255 Faoi 2026Dearbhaichte
Quality Control Engineer$70,200
Ìre I
Greensboro, NC7 Cèit 20251 Dàmh 2025Dearbhaichte
Quality Control Engineer$70,200
Ìre I
Greensboro, NC2 Cèit 20251 Dàmh 2025Air a tharraing air ais
Quality Control Manager (heavy Civil Construction)$70,595
pàirt-àm · Ìre II
Greensboro, NC11 Dùbh 20246 Faoi 2025Air a tharraing air ais

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).