Dachaigh › Luchd-obrach › Sibelco North America Inc.
Sibelco North America Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Sibelco North America Inc. 27 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 26. Tuarastal meadhanach a chaidh a thabhann: $104,166.
A bheil Sibelco North America Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Sibelco North America Inc. 27 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 10 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig Sibelco North America Inc.: 3 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Mineral Process Technology Engineer | 3 | $135,000 |
| VP, Transformations | 2 | $250,000 |
| Scientist | 2 | $92,876 |
| Senior Engineer Automation | 2 | $100,485 |
| Vice President Finance Americas | 2 | $336,561 |
| Technician Lab | 2 | $44,408 |
| Director, Project - North America | 1 | $145,000 |
| Project Purchaser | 1 | $75,000 |
| Director, Technology & Innovation, NAM | 1 | $184,642 |
| Procurement Specialist | 1 | $75,000 |
| Engineer Process | 1 | $85,000 |
| Manager Project Controls | 1 | $110,000 |
| Manager, Hydrometallurgy | 1 | $150,000 |
| Data Analyst | 1 | $86,021 |
| VP of Operations | 1 | $262,140 |
| Senior Process Control Engineer - Mining and Mineral Process | 1 | $145,000 |
| Business Analyst | 1 | $74,880 |
| Sourcing & Contracting Specialist-Mineral Processing | 1 | $79,070 |
| Chemical Engineer | 1 | $85,862 |
| Chemical Process Engineer | 1 | $85,862 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 6 | $145,000 |
| FY2024 | 5 | $110,000 |
| FY2025 | 11 | $130,000 |
| FY2026 | 5 | $70,970 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Operations Research Analysts5
- Mining and Geological Engineers, Including Mining Safety Engineers5
- Purchasing Agents, Except Wholesale, Retail, and Farm Products3
- Materials Scientists3
- Architectural and Engineering Managers2
- Software Developers2
- Chemical Engineers2
- Industrial Production Managers1
- Industrial Engineers1
- Electrical Engineers1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Chemical Process Engineer | $85,862 Ìre I | Bakersville, NC | 10 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Technician Lab | $51,334 Ìre I | Bakersville, NC | 5 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Technician Lab | $37,482 Ìre I | Bakersville, NC | 1 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Senior Engineer Automation | $70,970 Ìre I | Spruce Pine, NC | 1 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Chemical Engineer | $85,862 Ìre I | Bakersville, NC | 1 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Vice President Finance Americas | $336,561 Ìre IV | Charlotte, NC | 11 Sult 2025 | 11 Sult 2025 | Dearbhaichte |
| Mineral Process Technology Engineer | $142,800 H-1B1 (Sile) · Ìre IV | Bakersville, NC | 23 Iuch 2025 | 4 Dàmh 2025 | Dearbhaichte |
| Mineral Process Technology Engineer | $105,893–$129,032 H-1B1 (Sile) · Ìre IV | Bakersville, NC | 10 Iuch 2025 | 4 Dàmh 2025 | Dearbhaichte |
| Business Analyst | $74,880–$100,214 Ìre I | Charlotte, NC | 11 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Scientist | $102,440–$129,032 Ìre III | Bakersville, NC | 6 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Vice President Finance Americas | $336,561 Ìre IV | Charlotte, NC | 22 Cèit 2025 | 12 Samh 2025 | Dearbhaichte |
| Sourcing & Contracting Specialist-Mineral Processing | $79,070 E-3 · Ìre IV | Spruce Pine, NC | 16 Gibl 2025 | 29 Lùna 2025 | Dearbhaichte |
| Data Analyst | $86,021–$129,032 Ìre II | Bakersville, NC | 24 Màrt 2025 | 31 Màrt 2025 | Dearbhaichte |
| VP of Operations | $262,140–$336,268 H-1B1 (Sile) · Ìre IV | Spruce Pine, NC | 7 Gearr 2025 | 10 Gearr 2025 | Dearbhaichte |
| Senior Process Control Engineer - Mining and Mineral Process | $145,000 H-1B1 (Sile) · Ìre IV | Spruce Pine, NC | 4 Gearr 2025 | 10 Gearr 2025 | Dearbhaichte |
| Senior Engineer Automation | $130,000 H-1B1 (Sile) · Ìre IV | Spruce Pine, NC | 9 Faoi 2025 | 15 Faoi 2025 | Dearbhaichte |
| Manager, Hydrometallurgy | $150,000 H-1B1 (Sile) · Ìre IV | Bakersville, NC | 23 Cèit 2024 | 30 Cèit 2024 | Dearbhaichte |
| Scientist | $83,312–$123,468 Ìre II | Charlotte, NC | 19 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Mineral Process Technology Engineer | $135,000–$145,000 H-1B1 (Sile) · Ìre III | Bakersville, NC | 28 Gearr 2024 | 4 Màrt 2024 | Dearbhaichte |
| Manager Project Controls | $110,000–$165,770 E-3 · Ìre IV | Spruce Pine, NC | 5 Faoi 2024 | 15 Faoi 2024 | Dearbhaichte |
| Engineer Process | $85,000–$90,000 E-3 · Ìre II | Spruce Pine, NC | 17 Dàmh 2023 | 15 Faoi 2024 | Dearbhaichte |
| Procurement Specialist | $75,000–$92,000 E-3 · Ìre II | Spruce Pine, NC | 2 Lùna 2023 | 29 Lùna 2023 | Dearbhaichte |
| Director, Technology & Innovation, NAM | $184,642–$217,475 H-1B1 (Sile) · Ìre IV | Spruce Pine, NC | 2 Lùna 2023 | 1 Sult 2023 | Dearbhaichte |
| Project Purchaser | $75,000–$92,000 E-3 · Ìre III | Spruce Pine, NC | 1 Cèit 2023 | 8 Cèit 2023 | Dearbhaichte |
| Director, Project - North America | $145,000–$217,000 H-1B1 (Sile) · Ìre IV | Spruce Pine, NC | 24 Gearr 2023 | 6 Màrt 2023 | Dearbhaichte |
| VP, Transformations | $250,000–$330,000 Ìre IV | Spruce Pine, NC | 29 Samh 2022 | 12 Dùbh 2022 | Dearbhaichte |
| VP, Transformations | $250,000–$330,000 Ìre IV | Spruce Pine, NC | 20 Dàmh 2022 | 1 Dùbh 2022 | Diùltadh |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).