Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Siemens Energy, Inc. › Commercial Project Manager

Commercial Project Manager aig Siemens Energy, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Commercial Project Manager aig Siemens Energy, Inc.. Tuarastal bunasach meadhanach $115,652; leth meadhanach $115,000–$116,304.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$115,652
Leath mheadhanach nan tuarastalan$115,000–$116,304
Ceudail 10mh–90mh$115,000–$149,153

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$116,304
FY20251$116,304
FY20264$115,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$115,000
Ìre II
Raleigh, NC19 Gearr 202625 Gearr 2026Dearbhaichte
$182,002
Ìre III
Orlando, FL13 Gearr 202625 Cèit 2026Dearbhaichte
$115,000
H-1B1 (Sile) · Ìre II
Raleigh, NC19 Samh 202521 Samh 2025Dearbhaichte
$115,000
H-1B1 (Sile) · Ìre II
Raleigh, NC12 Samh 202521 Samh 2025Dearbhaichte
$116,304Orlando, FL10 Màrt 202525 Cèit 2025Dearbhaichte
$116,304
Ìre II
Orlando, FL5 Cèit 202330 Dàmh 2023Dearbhaichte

Obraichean eile aig Siemens Energy, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).