Dachaigh › Luchd-obrach › Skanska USA Building Inc.
Skanska USA Building Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Skanska USA Building Inc. 37 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 37. Tuarastal meadhanach a chaidh a thabhann: $100,000.
A bheil Skanska USA Building Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Skanska USA Building Inc. 37 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 29 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig Skanska USA Building Inc.: 8 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Project Engineer | 11 | $74,984 |
| Project Manager | 7 | $122,184 |
| Assistant Project Manager | 6 | $100,090 |
| Senior Project Engineer | 4 | $100,640 |
| Senior Scheduler | 2 | $106,963 |
| Senior Estimator | 2 | $137,500 |
| Field Engineer | 1 | $78,150 |
| Senior Preconstruction Engineer | 1 | $120,000 |
| Senior Preconstruction and VDC Engineer | 1 | $99,589 |
| Senior Business Process Specialist | 1 | $120,000 |
| Preconstruction Engineer | 1 | $77,730 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 8 | $86,231 |
| FY2024 | 12 | $85,004 |
| FY2025 | 12 | $113,150 |
| FY2026 | 5 | $113,170 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Tampa, FL7
- Orlando, FL3
- Irving, TX3
- Cincinnati, OH3
- Hillsboro, OR2
- Rockville, MD2
- Phoenix, AZ2
- Atlanta, GA2
- Fort Lauderdale, FL2
- Riverview, FL1
- Tarrytown, NY1
- Fort Worth, TX1
- Blue Bell, PA1
- Fort Myers, FL1
- Goodyear, AZ1
- Chandler, AZ1
- San Francisco, CA1
- New York, NY1
- Conshohocken, PA1
- Houston, TX1
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Preconstruction Engineer | $77,730–$102,300 Ìre II | Fort Lauderdale, FL | 29 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Project Manager | $133,688 | Tampa, FL | 12 Cèit 2026 | 1 Ògmh 2026 | Dearbhaichte |
| Project Manager | $122,184 | Tampa, FL | 12 Cèit 2026 | 1 Ògmh 2026 | Dearbhaichte |
| Senior Project Engineer | $89,981–$117,820 Ìre II | Houston, TX | 11 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Senior Scheduler | $113,170 Ìre II | Orlando, FL | 16 Dùbh 2025 | 3 Màrt 2026 | Dearbhaichte |
| Senior Project Engineer | $360,000 Ìre IV | New York, NY | 7 Lùna 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Senior Estimator | $120,000 Ìre IV | Cincinnati, OH | 29 Iuch 2025 | 15 Lùna 2025 | Dearbhaichte |
| Senior Estimator | $155,000 Ìre IV | Phoenix, AZ | 29 Iuch 2025 | 11 Lùna 2025 | Dearbhaichte |
| Project Manager | $133,937 Ìre II | Conshohocken, PA | 23 Iuch 2025 | 10 Samh 2025 | Dearbhaichte |
| Assistant Project Manager | $100,180 Ìre II | Atlanta, GA | 23 Cèit 2025 | 9 Ògmh 2025 | Dearbhaichte |
| Senior Project Engineer | $111,300 Ìre II | San Francisco, CA | 19 Cèit 2025 | 25 Sult 2025 | Dearbhaichte |
| Project Engineer | $73,440 Ìre I | Fort Lauderdale, FL | 7 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Assistant Project Manager | $103,317 Ìre II | Irving, TX | 7 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Assistant Project Manager | $99,300 Ìre II | Tampa, FL | 7 Cèit 2025 | 29 Lùna 2025 | Dearbhaichte |
| Senior Business Process Specialist | $120,000 Ìre II | Irving, TX | 8 Gibl 2025 | 5 Cèit 2025 | Dearbhaichte |
| Project Manager | $115,000 Ìre II | Chandler, AZ | 16 Faoi 2025 | 25 Màrt 2025 | Dearbhaichte |
| Assistant Project Manager | $100,000 Ìre II | Cincinnati, OH | 15 Samh 2024 | 2 Dùbh 2024 | Dearbhaichte |
| Senior Preconstruction and VDC Engineer | $99,589 Ìre IV | Cincinnati, OH | 5 Lùna 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $82,283 Ìre I | Rockville, MD | 10 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $87,724 Ìre II | Atlanta, GA | 3 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $73,548 Ìre I | Irving, TX | 3 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $68,182 Ìre I | Fort Myers, FL | 2 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $74,984 Ìre I | Tampa, FL | 2 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $69,579 Ìre I | Goodyear, AZ | 10 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Senior Scheduler | $100,756 Ìre II | Orlando, FL | 18 Màrt 2024 | 29 Lùna 2024 | Dearbhaichte |
| Project Manager | $131,310 Ìre II | Blue Bell, PA | 12 Màrt 2024 | 1 Gibl 2024 | Dearbhaichte |
| Senior Preconstruction Engineer | $120,000 Ìre IV | Phoenix, AZ | 5 Màrt 2024 | 29 Lùna 2024 | Dearbhaichte |
| Field Engineer | $78,150 Ìre I | Rockville, MD | 26 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Project Manager | $115,000 Ìre III | Hillsboro, OR | 26 Sult 2023 | 9 Dàmh 2023 | Dearbhaichte |
| Project Engineer | $69,550 Ìre I | Tampa, FL | 7 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Senior Project Engineer | $83,000 Ìre II | Fort Worth, TX | 7 Sult 2023 | 18 Sult 2023 | Dearbhaichte |
| Project Manager | $110,493 Ìre II | Tampa, FL | 3 Lùna 2023 | 6 Sult 2023 | Dearbhaichte |
| Project Engineer | $75,141 Ìre I | Orlando, FL | 13 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Project Engineer | $87,462 Ìre II | Riverview, FL | 8 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Project Engineer | $85,000 Ìre II | Hillsboro, OR | 8 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Assistant Project Manager | $97,843 Ìre II | Tampa, FL | 24 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Assistant Project Manager | $115,000 Ìre I | Tarrytown, NY | 24 Cèit 2023 | 12 Ògmh 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).