Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › SLK America Inc › Delivery Manager

Delivery Manager aig SLK America Inc: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Delivery Manager aig SLK America Inc. Tuarastal bunasach meadhanach $95,410; leth meadhanach $79,492–$102,669.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$95,410
Leath mheadhanach nan tuarastalan$79,492–$102,669
Ceudail 10mh–90mh$76,086–$111,301

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20253$88,150
FY20263$102,669

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$76,606
Ìre II
Cincinnati, OH24 Dùbh 202518 Cèit 2026Dearbhaichte
$119,933
Ìre III
Round Rock, TX10 Dùbh 202510 Dùbh 2025Dearbhaichte
$102,669
Ìre III
Aiken, SC14 Samh 202523 Gibl 2026Dearbhaichte
$102,669
Ìre III
Aiken, SC28 Lùna 20254 Sult 2025Dearbhaichte
$75,566
Ìre II
Cincinnati, OH3 Gearr 202510 Gearr 2025Dearbhaichte
$88,150
Ìre II
Riverwoods, IL28 Dàmh 20244 Samh 2024Dearbhaichte

Delivery Manager aig gach neach-fastaidh →

Obraichean eile aig SLK America Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).