Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › SLK America Inc › Onsite Application Support Manager

Onsite Application Support Manager aig SLK America Inc: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Onsite Application Support Manager aig SLK America Inc. Tuarastal bunasach meadhanach $134,077; leth meadhanach $130,000–$134,077.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$134,077
Leath mheadhanach nan tuarastalan$130,000–$134,077
Ceudail 10mh–90mh$130,000–$141,777

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$130,000
FY20252$134,077

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$134,077
Ìre III
Charles Town, WV3 Dàmh 202418 Màrt 2025Dearbhaichte
$134,077
Ìre III
Charles Town, WV3 Dàmh 202418 Màrt 2025Dearbhaichte
$130,000
Ìre III
Charles Town, WV30 Cèit 20244 Ògmh 2024Dearbhaichte
$146,910
Ìre IV
Charles Town, WV29 Cèit 20244 Ògmh 2024Dearbhaichte
$130,000
Ìre IV
Ellington, CT14 Cèit 202417 Cèit 2024Dearbhaichte

Obraichean eile aig SLK America Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).