Dachaigh › Luchd-obrach › SLR International Corporation
SLR International Corporation: Tuarastalan H-1B agus taic bhìosa
Chuir SLR International Corporation 17 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 17. Tuarastal meadhanach a chaidh a thabhann: $105,000.
A bheil SLR International Corporation a’ toirt taic do bhìosaichean H-1B?
Chuir SLR International Corporation 17 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 27 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Senior Engineer | 4 | $115,000 |
| Principal Geologist | 3 | $160,000 |
| Project Engineer | 3 | $88,650 |
| Associate Engineer | 2 | $80,500 |
| Senior Geologist | 1 | $125,000 |
| Staff Transportation Engineer | 1 | $66,500 |
| Principal Engineering Geologist | 1 | $150,000 |
| Staff Engineer - Greenhouse Gas Emissions | 1 | $78,000 |
| Senior Principal Engineer, Mine Waste Engineering | 1 | $200,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $87,325 |
| FY2024 | 5 | $150,000 |
| FY2025 | 5 | $105,000 |
| FY2026 | 3 | $78,000 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Lakewood, CO4
- Walnut Creek, CA4
- Fairbanks, AK2
- Irvine, CA2
- Anchorage, AK2
- Knoxville, TN1
- New Haven, CT1
- Houston, TX1
Dreuchdan
- Environmental Engineers9
- Geoscientists, Except Hydrologists and Geographers4
- Civil Engineers2
- Mining and Geological Engineers, Including Mining Safety Engineers2
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Senior Principal Engineer, Mine Waste Engineering | $200,000–$240,000 E-3 · Ìre IV | Lakewood, CO | 27 Cèit 2026 | 4 Ògmh 2026 | Dearbhaichte |
| Staff Engineer - Greenhouse Gas Emissions | $78,000–$88,000 Ìre I | Houston, TX | 20 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Project Engineer | $96,304–$106,304 Ìre II | Fairbanks, AK | 12 Ògmh 2025 | 3 Samh 2025 | Dearbhaichte |
| Senior Engineer | $125,000–$145,000 E-3 · Ìre II | Walnut Creek, CA | 25 Gearr 2025 | 31 Màrt 2025 | Dearbhaichte |
| Senior Engineer | $125,000–$145,000 E-3 · Ìre II | Walnut Creek, CA | 14 Gearr 2025 | 28 Ògmh 2025 | Dearbhaichte |
| Senior Engineer | $105,000–$125,000 Ìre II | Anchorage, AK | 18 Dàmh 2024 | 28 Dàmh 2024 | Dearbhaichte |
| Senior Engineer | $105,000–$125,000 Ìre II | Anchorage, AK | 10 Dàmh 2024 | 28 Dàmh 2024 | Dearbhaichte |
| Principal Geologist | $160,000–$180,000 H-1B1 (Sile) · Ìre III | Lakewood, CO | 27 Ògmh 2024 | 8 Iuch 2024 | Dearbhaichte |
| Principal Geologist | $160,000–$180,000 H-1B1 (Sile) · Ìre III | Lakewood, CO | 21 Ògmh 2024 | 28 Lùna 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| Staff Transportation Engineer | $66,500–$76,500 Ìre I | New Haven, CT | 8 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| Senior Geologist | $125,000–$145,000 Ìre III | Walnut Creek, CA | 21 Samh 2023 | 18 Dùbh 2023 | Dearbhaichte |
| Project Engineer | $88,650–$98,650 Ìre II | Fairbanks, AK | 20 Ògmh 2023 | 10 Iuch 2023 | Dearbhaichte |
| Project Engineer | $72,000–$92,000 Ìre I | Irvine, CA | 11 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Associate Engineer | $75,000–$95,000 Ìre I | Knoxville, TN | 26 Faoi 2023 | 30 Faoi 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Associate Engineer | $86,000–$106,000 E-3 · Ìre I | Walnut Creek, CA | 5 Faoi 2023 | 28 Ògmh 2023 | Dearbhaichte |
| Principal Geologist | $145,000–$165,000 H-1B1 (Sile) · Ìre III | Lakewood, CO | 3 Dàmh 2022 | 4 Dàmh 2022 | Dearbhaichte |
| Principal Engineering Geologist | $150,000–$170,000 Ìre IV | Irvine, CA | 18 Lùna 2021 | 1 Dàmh 2021 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).