Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Softrams, LLC › Lead Full Stack Developer

Lead Full Stack Developer aig Softrams, LLC: Tuarastalan H-1B

12 iarrtasan cumhaichean-obrach airson an dreuchd Lead Full Stack Developer aig Softrams, LLC. Tuarastal bunasach meadhanach $150,827; leth meadhanach $139,932–$151,654.

Iarrtasan (LCAs)12
Tuarastal meadhanach a chaidh a thabhann$150,827
Leath mheadhanach nan tuarastalan$139,932–$151,654
Ceudail 10mh–90mh$139,932–$173,209

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$138,394
FY20255$151,654
FY20265$139,932

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$139,932
Ìre II
Windsor Mill, MD12 Ògmh 202612 Ògmh 2026Dearbhaichte
$139,932
Ìre II
Windsor Mill, MD16 Faoi 202622 Cèit 2026Dearbhaichte
$139,932
Ìre II
Windsor Mill, MD23 Dùbh 202522 Cèit 2026Dearbhaichte
$175,604
Ìre III
Arlington, VA20 Samh 202524 Gibl 2026Dearbhaichte
$175,604
Ìre III
Arlington, VA4 Samh 202524 Gibl 2026Dearbhaichte
$151,654
Ìre II
Woodlawn, MD24 Gibl 202530 Cèit 2025Dearbhaichte
$151,654
Ìre II
Windsor Mill, MD7 Màrt 202530 Cèit 2025Dearbhaichte
$151,654
Ìre II
Windsor Mill, MD27 Gearr 202530 Cèit 2025Dearbhaichte
$151,654
Ìre II
Windsor Mill, MD18 Gearr 202530 Cèit 2025Dearbhaichte
$130,000
Ìre II
Windsor Mill, MD24 Gibl 202322 Cèit 2023Dearbhaichte
$146,788
Ìre III
Leesburg, VA13 Dàmh 202215 Gearr 2023Dearbhaichte
$150,000
Ìre III
Windsor Mill, MD6 Dàmh 202231 Dàmh 2022Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig Softrams, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).