Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Southwest Airlines Co. › Sr. Data Engineer

Sr. Data Engineer aig Southwest Airlines Co.: Tuarastalan H-1B

14 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Data Engineer aig Southwest Airlines Co.. Tuarastal bunasach meadhanach $139,464; leth meadhanach $134,992–$141,773.

Iarrtasan (LCAs)14
Tuarastal meadhanach a chaidh a thabhann$139,464
Leath mheadhanach nan tuarastalan$134,992–$141,773
Ceudail 10mh–90mh$130,270–$153,953

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20235$139,464
FY20244$130,270
FY20251$156,998
FY20263$141,773

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$141,773–$185,000
Ìre IV
Dallas, TX10 Gibl 202628 Sult 2026Dearbhaichte
$141,773–$194,200
Ìre IV
Dallas, TX7 Faoi 202619 Faoi 2026Dearbhaichte
$157,414–$194,200
Ìre IV
Dallas, TX24 Samh 202516 Cèit 2026Dearbhaichte
$156,998–$188,500
Ìre IV
Dallas, TX14 Iuch 202510 Faoi 2026Dearbhaichte
$130,270–$183,000
Ìre IV
Dallas, TX20 Cèit 20243 Ògmh 2024Dearbhaichte
$130,270–$183,000
Ìre IV
Dallas, TX13 Màrt 20242 Lùna 2024Dearbhaichte
$130,270–$183,000
Ìre IV
Dallas, TX8 Màrt 20246 Lùna 2024Dearbhaichte
—
Ìre IV
Dallas, TX5 Màrt 20246 Lùna 2024Diùltadh
$139,464–$183,000
Ìre IV
Dallas, TX25 Dàmh 202314 Samh 2023Dearbhaichte
$139,464–$183,000
Ìre IV
Dallas, TX19 Sult 202329 Sult 2023Dearbhaichte
$139,464–$183,000
Ìre IV
Dallas, TX9 Lùna 202319 Lùna 2023Dearbhaichte, an uair sin air a tharraing air ais
$139,464–$181,200
Ìre IV
Dallas, TX5 Iuch 202324 Iuch 2023Dearbhaichte
$134,992–$183,000
Ìre IV
Dallas, TX4 Cèit 202316 Cèit 2023Dearbhaichte
$134,992–$181,200
Ìre IV
Dallas, TX19 Dùbh 202210 Faoi 2023Dearbhaichte

Sr. Data Engineer aig gach neach-fastaidh →

Obraichean eile aig Southwest Airlines Co.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).