Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › SRK Systems Inc › .Net developer with Azure

.Net developer with Azure aig SRK Systems Inc: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd .Net developer with Azure aig SRK Systems Inc. Tuarastal bunasach meadhanach $127,754; leth meadhanach $127,754–$128,492.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$127,754
Leath mheadhanach nan tuarastalan$127,754–$128,492
Ceudail 10mh–90mh$127,754–$129,821

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$127,754
FY20261$130,707

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$130,707
Ìre III
Westchester, IL7 Cèit 202614 Sult 2026Dearbhaichte
$130,707
Ìre III
Westchester, IL7 Cèit 202614 Sult 2026Air a tharraing air ais
$127,754–$127,760
Ìre III
Westchester, IL12 Lùna 202412 Lùna 2024Dearbhaichte
$127,754–$127,760
Ìre III
Westchester, IL5 Lùna 20245 Lùna 2024Dearbhaichte
$127,754–$127,760
Ìre III
Westchester, IL29 Iuch 20245 Lùna 2024Dearbhaichte

Obraichean eile aig SRK Systems Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).