Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › SSR Mining Inc.

SSR Mining Inc.: Tuarastalan H-1B agus taic bhìosa

Chuir SSR Mining Inc. 7 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 6. Tuarastal meadhanach a chaidh a thabhann: $244,500.

Iarrtasan (LCAs)7
Dearbhaichte6
Seòladh an neach-fhastaidhDenver, CO
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$244,500
Leath mheadhanach nan tuarastalan$164,750–$313,750
Ceudail 10mh–90mh$150,000–$425,000

A bheil SSR Mining Inc. a’ toirt taic do bhìosaichean H-1B?

Chuir SSR Mining Inc. 7 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 16 Sult 2024. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Mining Engineering Manager, Business Evaluation2$150,000
Executive Vice President – Operations & Sustainability1$525,000
Senior Vice President – Exploration1$325,000
Director - Health, Safety, & Risk Systems1$209,000
Mining Engineering Manager1$280,000
Senior Manager, Mining Engineering1—

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20236$244,500
FY20241—

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Senior Manager, Mining Engineering$291,200
E-3 · Ìre IV
Valmy, NV16 Sult 202415 Gearr 2025Diùltadh
Mining Engineering Manager, Business Evaluation$150,000
Ìre I
Denver, CO12 Ògmh 202326 Ògmh 2023Dearbhaichte
Mining Engineering Manager, Business Evaluation$150,000
Ìre I
Denver, CO1 Ògmh 202326 Ògmh 2023Dearbhaichte, an uair sin air a tharraing air ais
Director - Health, Safety, & Risk Systems$209,000–$220,000
E-3 · Ìre IV
Denver, CO7 Màrt 202315 Ògmh 2023Dearbhaichte
Mining Engineering Manager$280,000
E-3 · Ìre IV
Valmy, NV16 Gearr 20231 Cèit 2023Dearbhaichte
Executive Vice President – Operations & Sustainability$525,000
E-3 · Ìre IV
Denver, CO6 Dùbh 20221 Faoi 2023Dearbhaichte
Senior Vice President – Exploration$325,000
E-3 · Ìre IV
Denver, CO9 Samh 20225 Dùbh 2022Dearbhaichte

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).