Dachaigh › Luchd-obrach › SSR Mining Inc.
SSR Mining Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir SSR Mining Inc. 7 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 6. Tuarastal meadhanach a chaidh a thabhann: $244,500.
A bheil SSR Mining Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir SSR Mining Inc. 7 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 16 Sult 2024. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Mining Engineering Manager, Business Evaluation | 2 | $150,000 |
| Executive Vice President – Operations & Sustainability | 1 | $525,000 |
| Senior Vice President – Exploration | 1 | $325,000 |
| Director - Health, Safety, & Risk Systems | 1 | $209,000 |
| Mining Engineering Manager | 1 | $280,000 |
| Senior Manager, Mining Engineering | 1 | — |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 6 | $244,500 |
| FY2024 | 1 | — |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Architectural and Engineering Managers3
- Mining and Geological Engineers, Including Mining Safety Engineers3
- Regulatory Affairs Managers1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Senior Manager, Mining Engineering | $291,200 E-3 · Ìre IV | Valmy, NV | 16 Sult 2024 | 15 Gearr 2025 | Diùltadh |
| Mining Engineering Manager, Business Evaluation | $150,000 Ìre I | Denver, CO | 12 Ògmh 2023 | 26 Ògmh 2023 | Dearbhaichte |
| Mining Engineering Manager, Business Evaluation | $150,000 Ìre I | Denver, CO | 1 Ògmh 2023 | 26 Ògmh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Director - Health, Safety, & Risk Systems | $209,000–$220,000 E-3 · Ìre IV | Denver, CO | 7 Màrt 2023 | 15 Ògmh 2023 | Dearbhaichte |
| Mining Engineering Manager | $280,000 E-3 · Ìre IV | Valmy, NV | 16 Gearr 2023 | 1 Cèit 2023 | Dearbhaichte |
| Executive Vice President – Operations & Sustainability | $525,000 E-3 · Ìre IV | Denver, CO | 6 Dùbh 2022 | 1 Faoi 2023 | Dearbhaichte |
| Senior Vice President – Exploration | $325,000 E-3 · Ìre IV | Denver, CO | 9 Samh 2022 | 5 Dùbh 2022 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).