Dachaigh › Luchd-obrach › Stantec Consulting Services Inc. › Civil Designer
Civil Designer aig Stantec Consulting Services Inc.: Tuarastalan H-1B
19 iarrtasan cumhaichean-obrach airson an dreuchd Civil Designer aig Stantec Consulting Services Inc.. Tuarastal bunasach meadhanach $86,507; leth meadhanach $82,422–$103,489.
Iarrtasan (LCAs)19
Tuarastal meadhanach a chaidh a thabhann$86,507
Leath mheadhanach nan tuarastalan$82,422–$103,489
Ceudail 10mh–90mh$75,429–$109,372
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 5 | $83,637 |
| FY2024 | 6 | $85,010 |
| FY2025 | 4 | $89,784 |
| FY2026 | 4 | $91,510 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $114,858 Ìre II | Pasadena, CA | 10 Ògmh 2026 | 1 Dùbh 2026 | Dearbhaichte |
| $90,002 Ìre I | Clearwater, FL | 11 Cèit 2026 | 25 Cèit 2026 | Dearbhaichte |
| $82,701 Ìre II | Winston-Salem, NC | 9 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $93,018 Ìre I | Plymouth, MN | 1 Dùbh 2025 | 5 Dùbh 2025 | Dearbhaichte |
| $85,010 Ìre I | Albany, NY | 18 Sult 2025 | 6 Dàmh 2025 | Dearbhaichte |
| $78,000 Ìre I | North Charleston, SC | 24 Ògmh 2025 | 27 Ògmh 2025 | Dearbhaichte |
| $105,893 Ìre I | Sacramento, CA | 16 Cèit 2025 | 5 Iuch 2025 | Dearbhaichte |
| $75,566 Ìre I | New Haven, CT | 10 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $94,557 Ìre I | New Haven, CT | 6 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $82,143 | Boston, MA | 6 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $86,507 Ìre I | Walnut Creek, CA | 22 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $83,512 Ìre I | Pasadena, CA | 15 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $102,000 Ìre II | Jacksonville, FL | 18 Faoi 2024 | 4 Màrt 2024 | Dearbhaichte |
| $108,000 Ìre II | Pasadena, CA | 16 Samh 2023 | 1 Dùbh 2023 | Dearbhaichte |
| $116,938 Ìre II | Irvine, CA | 5 Sult 2023 | 28 Gearr 2024 | Dearbhaichte |
| $70,325 Ìre I | Minneapolis, MN | 15 Lùna 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $74,880 Ìre I | Portland, ME | 1 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $83,637 Ìre II | Chandler, AZ | 6 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $104,978 Ìre II | Pasadena, CA | 31 Faoi 2023 | 26 Gearr 2023 | Dearbhaichte |
Civil Designer aig gach neach-fastaidh →
Obraichean eile aig Stantec Consulting Services Inc.
- Structural Engineer$105,290
- Civil Engineer EIT$77,480
- Civil Engineer$98,634
- Civil Engineer in Training$79,269
- Structural Designer$83,928
- Structural Engineer EIT$85,010
- Transportation Planner$90,501
- Project Manager$108,410
- Structural Engineer in Training$79,955
- Electrical Engineer$123,635
- Transportation Engineer$116,480
- Mechanical Designer$95,492
- Project Controls Specialist$85,009
- Transportation Designer$78,000
- Landscape Designer$70,262
- Geotechnical Engineer$104,156
- Geotechnical EIT$86,289
- Senior Structural Engineer$150,010
- Water Resources Engineer in Training$74,818
- Electrical Designer$79,758
- Geotechnical Engineer EIT$79,768
- Mechanical Engineer$95,056
- Process Designer$95,909
- BIM Coordinator$97,532
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).