Dachaigh › Luchd-obrach › The State of Nebraska, Department of Transportation
The State of Nebraska, Department of Transportation: Tuarastalan H-1B agus taic bhìosa
Chuir The State of Nebraska, Department of Transportation 19 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 19. Tuarastal meadhanach a chaidh a thabhann: $65,645.
A bheil The State of Nebraska, Department of Transportation a’ toirt taic do bhìosaichean H-1B?
Chuir The State of Nebraska, Department of Transportation 19 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 22 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Engineer | 4 | $65,032 |
| Transportation Planner II | 2 | $48,131 |
| Roadway Design Engineer | 2 | $66,654 |
| Professional Engineer I – Load Rating Engineer | 2 | $78,500 |
| Engineer I | 1 | $54,205 |
| Highway Designer III | 1 | $60,237 |
| Signing Engineer | 1 | $63,586 |
| Load Rating Engineer | 1 | $63,586 |
| Professional Engineer II | 1 | $99,154 |
| Professional Engineer I | 1 | $72,488 |
| Professional Engineer II – Project Scoping Unit Head | 1 | $100,000 |
| Bridge Inspection Engineer | 1 | $65,021 |
| Professional Engineer I - Roadway Consultant Coordinator | 1 | $79,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $55,848 |
| FY2024 | 4 | $55,858 |
| FY2025 | 6 | $67,070 |
| FY2026 | 6 | $78,500 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Roadway Design Engineer | $65,645 | Lincoln, NE | 22 Ògmh 2026 | 18 Dùbh 2026 | Dearbhaichte |
| Professional Engineer I – Load Rating Engineer | $78,500–$98,500 Ìre II | Lincoln, NE | 12 Cèit 2026 | 26 Cèit 2026 | Dearbhaichte |
| Professional Engineer I – Load Rating Engineer | $78,500–$98,500 H-1B1 (Sile) · Ìre II | Lincoln, NE | 1 Cèit 2026 | 6 Cèit 2026 | Dearbhaichte |
| Professional Engineer I - Roadway Consultant Coordinator | $79,000–$99,000 Ìre II | Lincoln, NE | 22 Gibl 2026 | 1 Cèit 2026 | Dearbhaichte |
| Bridge Inspection Engineer | $65,021 | Lincoln, NE | 15 Dùbh 2025 | 1 Gearr 2026 | Dearbhaichte |
| Professional Engineer II – Project Scoping Unit Head | $100,000–$120,000 Ìre III | Lincoln, NE | 25 Samh 2025 | 1 Dùbh 2025 | Dearbhaichte |
| Roadway Design Engineer | $67,662 | Lincoln, NE | 30 Iuch 2025 | 1 Faoi 2026 | Dearbhaichte |
| Professional Engineer I | $72,488 | Norfolk, NE | 2 Cèit 2025 | 15 Cèit 2025 | Dearbhaichte |
| Professional Engineer II | $99,154 | Lincoln, NE | 18 Gearr 2025 | 20 Gearr 2025 | Dearbhaichte |
| Engineer | $66,477 | Lincoln, NE | 10 Gearr 2025 | 21 Gearr 2025 | Dearbhaichte |
| Signing Engineer | $63,586 | Lincoln, NE | 18 Dùbh 2024 | 24 Dùbh 2024 | Dearbhaichte |
| Load Rating Engineer | $63,586 | Lincoln, NE | 4 Samh 2024 | 8 Samh 2024 | Dearbhaichte |
| Engineer | $66,851 | Lincoln, NE | 23 Lùna 2024 | 1 Gearr 2025 | Dearbhaichte |
| Engineer | $63,586 | Lincoln, NE | 1 Lùna 2024 | 5 Lùna 2024 | Dearbhaichte |
| Transportation Planner II | $48,131 | Lincoln, NE | 1 Gearr 2024 | 3 Màrt 2024 | Dearbhaichte |
| Transportation Planner II | $48,131 | Lincoln, NE | 23 Faoi 2024 | 3 Màrt 2024 | Dearbhaichte |
| Highway Designer III | $60,237 | Lincoln, NE | 7 Iuch 2023 | 23 Dùbh 2023 | Dearbhaichte |
| Engineer | $55,848 | Lincoln, NE | 19 Dàmh 2022 | 1 Samh 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
| Engineer I | $54,205 | Lincoln, NE | 14 Dàmh 2022 | 17 Dàmh 2022 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).