Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Strategic Resources International Inc › Team Lead

Team Lead aig Strategic Resources International Inc: Tuarastalan H-1B

9 iarrtasan cumhaichean-obrach airson an dreuchd Team Lead aig Strategic Resources International Inc. Tuarastal bunasach meadhanach $70,075; leth meadhanach $70,000–$74,880.

Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$70,075
Leath mheadhanach nan tuarastalan$70,000–$74,880
Ceudail 10mh–90mh$65,098–$79,518

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20234$76,679
FY20245$70,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$70,000–$70,001
Ìre I
Parlin, NJ11 Sult 202424 Gearr 2025Dearbhaichte
$70,000–$70,001
Ìre I
Parlin, NJ11 Sult 202424 Gearr 2025Dearbhaichte
$60,000–$60,001
Ìre I
Parlin, NJ11 Sult 202424 Gearr 2025Dearbhaichte
$70,075–$70,076
Ìre II
McKinney, TX20 Màrt 202420 Màrt 2024Dearbhaichte
$66,373–$66,374
Ìre II
Cedar Park, TX23 Faoi 202429 Faoi 2024Dearbhaichte
$83,678–$83,679
Ìre II
St. Charles, MO11 Sult 202318 Sult 2023Dearbhaichte
$78,478–$78,479
Ìre II
Freehold, NJ11 Sult 202318 Sult 2023Dearbhaichte
$70,075–$70,076
Ìre II
Little Elm, TX1 Lùna 20239 Lùna 2023Dearbhaichte
$74,880–$74,881
Ìre II
Parlin, NJ6 Faoi 20239 Faoi 2023Dearbhaichte

Team Lead aig gach neach-fastaidh →

Obraichean eile aig Strategic Resources International Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).