Dachaigh › Luchd-obrach › Structural Preservation Systems, LLC
Structural Preservation Systems, LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Structural Preservation Systems, LLC 25 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 23. Tuarastal meadhanach a chaidh a thabhann: $106,829.
A bheil Structural Preservation Systems, LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Structural Preservation Systems, LLC 25 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 29 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Estimator 1 | 6 | $99,368 |
| Project Manager 2 | 5 | $118,518 |
| Project Engineer | 3 | $72,221 |
| Division Manager | 3 | $158,183 |
| Construction Estimator | 2 | $95,000 |
| Project Manager 1 | 2 | $106,829 |
| Estimator 4 | 2 | $164,256 |
| Estimator 2 | 1 | $120,000 |
| Project Manager 3 (Senior Project Manager) | 1 | $135,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $95,000 |
| FY2024 | 7 | $106,829 |
| FY2025 | 7 | $120,000 |
| FY2026 | 7 | $102,735 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Chelmsford, MA8
- Long Island City, NY7
- Cheshire, CT4
- Hawthorne, NJ3
- Elkridge, MD1
- Schiller Park, IL1
- Centennial, CO1
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Project Manager 2 | $128,260 Ìre II | Chelmsford, MA | 29 Cèit 2026 | 10 Samh 2026 | Dearbhaichte |
| Division Manager | $175,000 Ìre II | Long Island City, NY | 30 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Estimator 1 | $102,735 Ìre II | Long Island City, NY | 10 Gibl 2026 | 8 Sult 2026 | Dearbhaichte |
| Project Engineer | $80,490 Ìre I | Cheshire, CT | 20 Faoi 2026 | 20 Iuch 2026 | Air a tharraing air ais |
| Estimator 1 | $102,735 Ìre II | Long Island City, NY | 20 Faoi 2026 | 20 Iuch 2026 | Dearbhaichte |
| Estimator 1 | $85,000 Ìre I | Hawthorne, NJ | 9 Dùbh 2025 | 16 Dùbh 2025 | Dearbhaichte |
| Project Manager 3 (Senior Project Manager) | $135,000 Ìre III | Chelmsford, MA | 5 Lùna 2025 | 6 Dàmh 2025 | Dearbhaichte |
| Division Manager | $158,183 Ìre II | Chelmsford, MA | 21 Iuch 2025 | 1 Sult 2025 | Dearbhaichte |
| Estimator 4 | $177,110 Ìre II | Hawthorne, NJ | 20 Ògmh 2025 | 4 Dàmh 2025 | Dearbhaichte |
| Estimator 1 | $105,000 Ìre II | Centennial, CO | 3 Ògmh 2025 | 4 Ògmh 2025 | Dearbhaichte |
| Estimator 2 | $120,000 Ìre II | Chelmsford, MA | 19 Cèit 2025 | 1 Iuch 2025 | Dearbhaichte |
| Project Manager 2 | $118,518 Ìre III | Cheshire, CT | 9 Dàmh 2024 | 7 Gearr 2025 | Dearbhaichte |
| Project Manager 2 | $118,518 Ìre III | Cheshire, CT | 26 Sult 2024 | 7 Gearr 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Estimator 1 | $96,000 Ìre II | Schiller Park, IL | 3 Gibl 2024 | 15 Gibl 2024 | Dearbhaichte |
| Project Manager 1 | $106,829 Ìre III | Chelmsford, MA | 22 Màrt 2024 | 22 Iuch 2024 | Dearbhaichte |
| Division Manager | $142,002 Ìre III | Chelmsford, MA | 7 Samh 2023 | 7 Samh 2023 | Dearbhaichte |
| Project Manager 1 | $106,829 Ìre II | Chelmsford, MA | 31 Dàmh 2023 | 31 Dàmh 2023 | Dearbhaichte |
| Project Manager 2 | $112,341 Ìre III | Chelmsford, MA | 31 Dàmh 2023 | 31 Dàmh 2023 | Dearbhaichte |
| Estimator 4 | $151,403 Ìre II | Hawthorne, NJ | 30 Dàmh 2023 | 6 Samh 2023 | Dearbhaichte |
| Estimator 1 | $95,000 Ìre II | Long Island City, NY | 30 Lùna 2023 | 8 Sult 2023 | Dearbhaichte |
| Construction Estimator | $95,000 Ìre II | Long Island City, NY | 30 Lùna 2023 | 13 Sult 2023 | Air a tharraing air ais |
| Project Engineer | $74,442 Ìre I | Cheshire, CT | 23 Lùna 2023 | 1 Dàmh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Construction Estimator | $95,000 Ìre II | Long Island City, NY | 14 Lùna 2023 | 25 Lùna 2023 | Dearbhaichte |
| Project Engineer | $70,000 Ìre I | Long Island City, NY | 19 Gibl 2022 | 1 Dàmh 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
| Project Manager 2 | $96,242 Ìre II | Elkridge, MD | 21 Dùbh 2021 | 31 Faoi 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).