Dachaigh › Luchd-obrach › Structure Tone, LLC
Structure Tone, LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Structure Tone, LLC 14 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 14. Tuarastal meadhanach a chaidh a thabhann: $86,757.
A bheil Structure Tone, LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Structure Tone, LLC 14 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 18 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Superintendent | 7 | $120,133 |
| Rotational Project Engineer | 1 | $86,757 |
| Assistant BIM/VDC Manager | 1 | $86,757 |
| Assistant Project Manager | 1 | $85,176 |
| Junior Estimator | 1 | $73,632 |
| MEP Superintendent | 1 | $120,266 |
| Close Out Coordinator | 1 | $75,000 |
| Assistant Superintendent | 1 | $74,506 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 7 | $86,757 |
| FY2024 | 3 | $120,266 |
| FY2025 | 1 | $74,506 |
| FY2026 | 3 | $108,558 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Civil Engineers6
- Construction Managers4
- Project Management Specialists2
- Cost Estimators1
- Industrial Engineers1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Superintendent | $120,000–$150,000 Ìre II | New York, NY | 18 Ògmh 2026 | 30 Sult 2026 | Dearbhaichte |
| Superintendent | $97,115–$98,880 Ìre II | New York, NY | 3 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Superintendent | $142,750–$210,000 E-3 · pàirt-àm · Ìre IV | New York, NY | 5 Faoi 2026 | 1 Gibl 2026 | Dearbhaichte |
| Assistant Superintendent | $74,506–$82,000 Ìre I | New York, NY | 11 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Close Out Coordinator | $75,000–$85,000 Ìre I | New York, NY | 10 Ògmh 2024 | 26 Lùna 2024 | Dearbhaichte |
| Superintendent | $126,714–$190,000 E-3 · Ìre IV | New York, NY | 4 Gibl 2024 | 29 Gibl 2024 | Dearbhaichte |
| Superintendent | $125,445–$149,594 Ìre II | New York, NY | 14 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Junior Estimator | $73,632–$81,369 Ìre III | Austin, TX | 13 Iuch 2023 | 24 Iuch 2023 | Dearbhaichte |
| Superintendent | $120,266–$130,000 Ìre II | New York, NY | 30 Cèit 2023 | 20 Sult 2023 | Dearbhaichte |
| Rotational Project Engineer | $86,757–$87,000 Ìre II | New York, NY | 26 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Assistant BIM/VDC Manager | $86,757–$88,000 Ìre II | New York, NY | 18 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Assistant Project Manager | $85,176–$100,000 Ìre II | Boston, MA | 27 Màrt 2023 | 15 Sult 2023 | Dearbhaichte |
| Superintendent | $86,757–$105,622 Ìre II | New York, NY | 27 Màrt 2023 | 15 Sult 2023 | Dearbhaichte |
| MEP Superintendent | $120,266–$127,500 E-3 · Ìre II | New York, NY | 2 Lùna 2022 | 16 Dàmh 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).