Dachaigh › Luchd-obrach › Superior Construction Company
Superior Construction Company: Tuarastalan H-1B agus taic bhìosa
Chuir Superior Construction Company 16 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 14. Tuarastal meadhanach a chaidh a thabhann: $99,500.
A bheil Superior Construction Company a’ toirt taic do bhìosaichean H-1B?
Chuir Superior Construction Company 16 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 23 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig Superior Construction Company: 6 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Assistant Project Manager | 4 | $101,000 |
| Project Engineer | 4 | $81,000 |
| Project Manager | 3 | $110,000 |
| Field Engineer | 3 | $89,210 |
| Estimator | 1 | $94,993 |
| Data Engineer | 1 | $104,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $102,100 |
| FY2024 | 6 | $90,000 |
| FY2025 | 7 | $107,000 |
| FY2026 | 1 | $134,992 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Project Manager | $134,992 Ìre IV | Tampa, FL | 23 Ògmh 2026 | 8 Sult 2026 | Dearbhaichte |
| Assistant Project Manager | $113,500 Ìre III | Tampa, FL | 7 Cèit 2025 | 12 Sult 2025 | Dearbhaichte |
| Project Engineer | $113,500 Ìre III | Tampa, FL | 30 Gibl 2025 | 12 Sult 2025 | Dearbhaichte |
| Project Engineer | — Ìre III | Tampa, FL | 30 Gibl 2025 | 12 Sult 2025 | Air a tharraing air ais |
| Project Engineer | $81,000 Ìre I | Jacksonville, FL | 9 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Engineer | $77,000 Ìre I | Tampa, FL | 9 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Manager | $110,000 Ìre III | Jacksonville, FL | 18 Màrt 2025 | 2 Sult 2025 | Dearbhaichte |
| Data Engineer | $104,000 Ìre III | Jacksonville, FL | 18 Màrt 2025 | 1 Sult 2025 | Dearbhaichte |
| Assistant Project Manager | $107,000 Ìre II | Jacksonville, FL | 6 Sult 2024 | 16 Sult 2024 | Dearbhaichte |
| Estimator | $94,993 Ìre II | Portage, IN | 4 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Assistant Project Manager | $85,508 Ìre II | Portage, IN | 4 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Field Engineer | $88,420 Ìre III | Lexington, SC | 19 Dàmh 2023 | 1 Samh 2023 | Dearbhaichte |
| Field Engineer | $90,000 Ìre II | Porter, IN | 10 Dàmh 2023 | 1 Dùbh 2023 | Dearbhaichte |
| Field Engineer | — Ìre II | Portage, IN | 5 Dàmh 2023 | 1 Dùbh 2023 | Diùltadh |
| Assistant Project Manager | $95,000 Ìre II | Portage, IN | 7 Lùna 2023 | 1 Gearr 2024 | Dearbhaichte |
| Project Manager | $109,200 Ìre III | Jacksonville, FL | 9 Màrt 2023 | 8 Sult 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).