Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Synchrony Bank › VP, Solution Architect

VP, Solution Architect aig Synchrony Bank: Tuarastalan H-1B

11 iarrtasan cumhaichean-obrach airson an dreuchd VP, Solution Architect aig Synchrony Bank. Tuarastal bunasach meadhanach $155,000; leth meadhanach $147,425–$160,668.

Iarrtasan (LCAs)11
Tuarastal meadhanach a chaidh a thabhann$155,000
Leath mheadhanach nan tuarastalan$147,425–$160,668
Ceudail 10mh–90mh$144,300–$165,500

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$151,500
FY20243$145,000
FY20253$160,890
FY20262$155,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$155,000–$175,000
Ìre III
Abingdon, MD17 Gibl 20261 Dàmh 2026Dearbhaichte
$155,000–$175,000
Ìre IV
West Chester Township, OH1 Dàmh 202528 Màrt 2026Dearbhaichte
$170,000–$190,000
Ìre IV
Chicago, IL16 Sult 202523 Faoi 2026Dearbhaichte
$160,000–$180,000
Ìre IV
Alpharetta, GA23 Gibl 202516 Dàmh 2025Dearbhaichte
$160,890–$180,890
Ìre IV
West Chester Township, OH5 Samh 202411 Samh 2024Dearbhaichte
$154,700–$174,700
Ìre IV
West Chester Township, OH19 Lùna 20249 Sult 2024Dearbhaichte
$131,000–$151,000
pàirt-àm · Ìre III
Stamford, CT2 Cèit 20241 Samh 2024Dearbhaichte
$145,000–$165,000
Ìre III
West Chester Township, OH17 Gibl 20249 Sult 2024Dearbhaichte
$145,000–$165,000
Ìre III
West Chester, OH3 Gibl 202423 Lùna 2024Dearbhaichte
$138,000–$158,000
Ìre III
Cockeysville, MD9 Ògmh 20231 Dàmh 2023Dearbhaichte
$165,000–$185,000
Ìre IV
Chicago, IL6 Faoi 202323 Faoi 2023Dearbhaichte

Obraichean eile aig Synchrony Bank

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).