Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Tata Technologies, Inc. › Costing Manager

Costing Manager aig Tata Technologies, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Costing Manager aig Tata Technologies, Inc.. Tuarastal bunasach meadhanach $88,866; leth meadhanach $85,000–$88,866.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$88,866
Leath mheadhanach nan tuarastalan$85,000–$88,866
Ceudail 10mh–90mh$82,000–$88,866

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$85,000
FY20241$80,000
FY20253$88,866

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$88,866
Ìre I
Hagerstown, MD22 Lùna 202516 Faoi 2026Dearbhaichte
$88,866
Ìre I
Hagerstown, MD15 Lùna 202516 Faoi 2026Dearbhaichte
$88,866
Ìre I
Hagerstown, MD6 Lùna 202526 Faoi 2026Dearbhaichte
$80,000
Ìre II
Hagerstown, MD11 Faoi 20241 Ògmh 2024Dearbhaichte
$85,000
Ìre III
Hagerstown, MD17 Lùna 202018 Lùna 2020Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig Tata Technologies, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).