Dachaigh › Luchd-obrach › Tenstorrent USA Inc. › Staff Engineer
Staff Engineer aig Tenstorrent USA Inc.: Tuarastalan H-1B
20 iarrtasan cumhaichean-obrach airson an dreuchd Staff Engineer aig Tenstorrent USA Inc.. Tuarastal bunasach meadhanach $201,602; leth meadhanach $183,862–$206,250.
Iarrtasan (LCAs)20
Tuarastal meadhanach a chaidh a thabhann$201,602
Leath mheadhanach nan tuarastalan$183,862–$206,250
Ceudail 10mh–90mh$164,528–$227,079
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $205,000 |
| FY2024 | 7 | $200,070 |
| FY2025 | 3 | $203,133 |
| FY2026 | 9 | $187,741 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $186,472–$216,091 Ìre III | Santa Clara, CA | 3 Ògmh 2026 | 22 Ògmh 2026 | Dearbhaichte |
| $164,528–$287,430 Ìre IV | Austin, TX | 24 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte, an uair sin air a tharraing air ais |
| $229,590–$264,550 Ìre IV | Santa Clara, CA | 8 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $164,528–$242,000 Ìre IV | Austin, TX | 31 Màrt 2026 | 20 Gibl 2026 | Dearbhaichte |
| $203,133–$229,590 Ìre III | Santa Clara, CA | 6 Màrt 2026 | 4 Sult 2026 | Dearbhaichte |
| $229,590–$265,650 Ìre IV | Santa Clara, CA | 5 Gearr 2026 | 17 Gearr 2026 | Dearbhaichte |
| $203,133–$229,590 Ìre III | Santa Clara, CA | 3 Gearr 2026 | 23 Gearr 2026 | Dearbhaichte, an uair sin air a tharraing air ais |
| $187,741–$226,138 Ìre II | Santa Clara, CA | 14 Faoi 2026 | 26 Faoi 2026 | Dearbhaichte |
| $164,528–$238,700 Ìre IV | Austin, TX | 19 Samh 2025 | 8 Dùbh 2025 | Dearbhaichte |
| $203,133–$229,590 Ìre III | Santa Clara, CA | 10 Sult 2025 | 29 Sult 2025 | Dearbhaichte |
| $176,030–$214,500 Ìre IV | Hillsboro, OR | 3 Sult 2025 | 22 Sult 2025 | Dearbhaichte |
| $210,000 Ìre IV | Austin, TX | 28 Dàmh 2024 | 9 Dùbh 2024 | Dearbhaichte |
| $213,380 Ìre IV | Santa Clara, CA | 25 Ògmh 2024 | 6 Dùbh 2024 | Dearbhaichte |
| $226,800 Ìre IV | Santa Clara, CA | 15 Màrt 2024 | 4 Lùna 2024 | Dearbhaichte |
| $160,399 Ìre II | Santa Clara, CA | 14 Màrt 2024 | 13 Sult 2024 | Dearbhaichte |
| $190,960 Ìre IV | Portland, OR | 12 Màrt 2024 | 12 Iuch 2024 | Dearbhaichte |
| $190,000 Ìre IV | Austin, TX | 23 Gearr 2024 | 7 Màrt 2024 | Dearbhaichte |
| $200,070 Ìre IV | Austin, TX | 3 Faoi 2024 | 14 Ògmh 2024 | Dearbhaichte |
| $204,000 Ìre IV | Santa Clara, CA | 11 Dàmh 2023 | 30 Dàmh 2023 | Dearbhaichte |
| $205,000 Ìre IV | Durham, NC | 25 Gibl 2023 | 8 Cèit 2023 | Dearbhaichte |
Staff Engineer aig gach neach-fastaidh →
Obraichean eile aig Tenstorrent USA Inc.
- Sr. Staff Engineer$186,202
- Sr. Engineer$164,528
- Engineer$135,150
- Staff Physical Design Engineer$200,000
- Principal Engineer$216,091
- Sr. Staff Engineer, Architecture$204,901
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).