Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Thermo Fisher Scientific Inc. › Engineer III, Validation

Engineer III, Validation aig Thermo Fisher Scientific Inc.: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Engineer III, Validation aig Thermo Fisher Scientific Inc.. Tuarastal bunasach meadhanach $98,082; leth meadhanach $93,163–$106,652.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$98,082
Leath mheadhanach nan tuarastalan$93,163–$106,652
Ceudail 10mh–90mh$87,853–$116,093

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$101,171
FY20246$94,568
FY20251$114,483

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$114,483–$160,000
Ìre III
Bedford, MA15 Faoi 202521 Màrt 2025Dearbhaichte
$82,306–$160,000
Ìre I
Waltham, MA12 Lùna 20241 Samh 2024Dearbhaichte
$119,850–$160,000
Ìre III
Cambridge, MA11 Iuch 202411 Dàmh 2024Dearbhaichte
$90,230–$160,000
Ìre III
High Point, NC18 Gibl 202418 Gibl 2024Dearbhaichte
$94,994–$160,000
Ìre III
High Point, NC25 Màrt 202425 Màrt 2024Dearbhaichte, an uair sin air a tharraing air ais
$104,042–$169,454
Ìre III
Plainville, MA22 Màrt 20248 Gibl 2024Dearbhaichte
$94,141–$160,000
Ìre II
Plainville, MA9 Faoi 202429 Faoi 2024Dearbhaichte
$101,171–$150,000
Ìre III
Chelmsford, MA18 Samh 20225 Dùbh 2022Dearbhaichte

Obraichean eile aig Thermo Fisher Scientific Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).