Dachaigh › Luchd-obrach › Thiess Mining USA Inc.
Thiess Mining USA Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Thiess Mining USA Inc. 11 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 11. Tuarastal meadhanach a chaidh a thabhann: $216,373.
A bheil Thiess Mining USA Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Thiess Mining USA Inc. 11 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 9 Faoi 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Vice President Operations North America | 2 | $370,000 |
| Mine Engineering Manager | 2 | $856,250 |
| Mine Engineering Manager - North America | 2 | $161,453 |
| Project Manager Consultant | 1 | $103,500 |
| Group Manager, Mine Reclamation – Thiess North America | 1 | $200,000 |
| Regional Manager Finance – Americas | 1 | $220,000 |
| Technical Services Manager | 1 | $239,200 |
| Manager, Mine Reclamation | 1 | $216,373 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $251,750 |
| FY2024 | 5 | $220,000 |
| FY2025 | 1 | $340,000 |
| FY2026 | 3 | $161,453 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Architectural and Engineering Managers7
- Chief Executives2
- Mining and Geological Engineers, Including Mining Safety Engineers1
- Financial Managers1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Mine Engineering Manager - North America | $161,453 H-1B1 (Sile) · Ìre III | Salt Lake City, UT | 9 Faoi 2026 | 22 Faoi 2026 | Dearbhaichte |
| Manager, Mine Reclamation | $216,373 E-3 · Ìre III | Salt Lake City, UT | 17 Samh 2025 | 9 Dùbh 2025 | Dearbhaichte |
| Mine Engineering Manager - North America | $161,453 H-1B1 (Sile) · Ìre III | Salt Lake City, UT | 30 Sult 2025 | 11 Samh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Vice President Operations North America | $340,000 E-3 · Ìre IV | Salt Lake City, UT | 12 Màrt 2025 | 1 Ògmh 2025 | Dearbhaichte |
| Mine Engineering Manager | $1,567,500 H-1B1 (Sile) · Ìre III | Salt Lake City, UT | 21 Ògmh 2024 | 11 Samh 2024 | Dearbhaichte |
| Technical Services Manager | $239,200 E-3 · Ìre III | Salt Lake City, UT | 5 Gibl 2024 | 1 Sult 2024 | Dearbhaichte |
| Regional Manager Finance – Americas | $220,000 E-3 · Ìre IV | Salt Lake City, UT | 4 Faoi 2024 | 1 Màrt 2024 | Dearbhaichte |
| Group Manager, Mine Reclamation – Thiess North America | $200,000 E-3 · Ìre III | Salt Lake City, UT | 18 Dùbh 2023 | 22 Dùbh 2023 | Dearbhaichte |
| Mine Engineering Manager | $145,000–$155,000 H-1B1 (Sile) · Ìre III | Salt Lake City, UT | 19 Dàmh 2023 | 11 Samh 2023 | Dearbhaichte |
| Vice President Operations North America | $400,000 E-3 · Ìre IV | Salt Lake City, UT | 2 Ògmh 2023 | 15 Iuch 2023 | Dearbhaichte |
| Project Manager Consultant | $103,500 H-1B1 (Sile) · Ìre II | Fremont Pass Climax, CO | 13 Dàmh 2022 | 11 Samh 2022 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).