Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Thiess Mining USA Inc.

Thiess Mining USA Inc.: Tuarastalan H-1B agus taic bhìosa

Chuir Thiess Mining USA Inc. 11 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 11. Tuarastal meadhanach a chaidh a thabhann: $216,373.

Iarrtasan (LCAs)11
Dearbhaichte11
Seòladh an neach-fhastaidhOgden, UT
Tuarastal meadhanach a chaidh a thabhann$216,373
Leath mheadhanach nan tuarastalan$161,453–$289,600
Ceudail 10mh–90mh$145,000–$400,000

A bheil Thiess Mining USA Inc. a’ toirt taic do bhìosaichean H-1B?

Chuir Thiess Mining USA Inc. 11 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 9 Faoi 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Vice President Operations North America2$370,000
Mine Engineering Manager2$856,250
Mine Engineering Manager - North America2$161,453
Project Manager Consultant1$103,500
Group Manager, Mine Reclamation – Thiess North America1$200,000
Regional Manager Finance – Americas1$220,000
Technical Services Manager1$239,200
Manager, Mine Reclamation1$216,373

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$251,750
FY20245$220,000
FY20251$340,000
FY20263$161,453

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Mine Engineering Manager - North America$161,453
H-1B1 (Sile) · Ìre III
Salt Lake City, UT9 Faoi 202622 Faoi 2026Dearbhaichte
Manager, Mine Reclamation$216,373
E-3 · Ìre III
Salt Lake City, UT17 Samh 20259 Dùbh 2025Dearbhaichte
Mine Engineering Manager - North America$161,453
H-1B1 (Sile) · Ìre III
Salt Lake City, UT30 Sult 202511 Samh 2025Dearbhaichte, an uair sin air a tharraing air ais
Vice President Operations North America$340,000
E-3 · Ìre IV
Salt Lake City, UT12 Màrt 20251 Ògmh 2025Dearbhaichte
Mine Engineering Manager$1,567,500
H-1B1 (Sile) · Ìre III
Salt Lake City, UT21 Ògmh 202411 Samh 2024Dearbhaichte
Technical Services Manager$239,200
E-3 · Ìre III
Salt Lake City, UT5 Gibl 20241 Sult 2024Dearbhaichte
Regional Manager Finance – Americas$220,000
E-3 · Ìre IV
Salt Lake City, UT4 Faoi 20241 Màrt 2024Dearbhaichte
Group Manager, Mine Reclamation – Thiess North America$200,000
E-3 · Ìre III
Salt Lake City, UT18 Dùbh 202322 Dùbh 2023Dearbhaichte
Mine Engineering Manager$145,000–$155,000
H-1B1 (Sile) · Ìre III
Salt Lake City, UT19 Dàmh 202311 Samh 2023Dearbhaichte
Vice President Operations North America$400,000
E-3 · Ìre IV
Salt Lake City, UT2 Ògmh 202315 Iuch 2023Dearbhaichte
Project Manager Consultant$103,500
H-1B1 (Sile) · Ìre II
Fremont Pass Climax, CO13 Dàmh 202211 Samh 2022Dearbhaichte

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).