Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Truist Bank › Sr. Principal Infrastructure Engineer/Advisor

Sr. Principal Infrastructure Engineer/Advisor aig Truist Bank: Tuarastalan H-1B

9 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Principal Infrastructure Engineer/Advisor aig Truist Bank. Tuarastal bunasach meadhanach $135,000; leth meadhanach $130,211–$146,777.

Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$135,000
Leath mheadhanach nan tuarastalan$130,211–$146,777
Ceudail 10mh–90mh$127,677–$152,187

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$134,732
FY20243$129,000
FY20253$146,777
FY20261$145,297

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$145,297Raleigh, NC17 Màrt 202613 Lùna 2026Dearbhaichte
$162,000
Ìre IV
Atlanta, GA15 Sult 20251 Dàmh 2025Dearbhaichte
$146,777
Ìre IV
Raleigh, NC2 Sult 202516 Faoi 2026Dearbhaichte
$130,211
Ìre IV
Atlanta, GA24 Sult 202427 Gearr 2025Dearbhaichte
$149,734
Ìre IV
Wilson, NC29 Iuch 20241 Dùbh 2024Dearbhaichte
$129,000
Ìre IV
Charlotte, NC27 Gearr 202411 Iuch 2024Dearbhaichte
$122,387
Ìre III
Raleigh, NC1 Dàmh 20237 Gearr 2024Dearbhaichte
$135,000
Ìre IV
Raleigh, NC18 Gibl 202313 Lùna 2023Dearbhaichte
$134,465
Ìre IV
Raleigh, NC21 Dàmh 202216 Faoi 2023Dearbhaichte

Obraichean eile aig Truist Bank

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).