Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › USM Business Sytems Inc › Oracle DBA - 4

Oracle DBA - 4 aig USM Business Sytems Inc: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Oracle DBA - 4 aig USM Business Sytems Inc. Tuarastal bunasach meadhanach $90,000; leth meadhanach $90,000–$136,448.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$90,000
Leath mheadhanach nan tuarastalan$90,000–$136,448
Ceudail 10mh–90mh$90,000–$136,479

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20242$90,000
FY20251$90,000
FY20262$136,474

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$136,500
Ìre IV
Madison, WI4 Ògmh 20265 Ògmh 2026Dearbhaichte
$136,448
Ìre IV
Madison, WI3 Samh 20257 Samh 2025Dearbhaichte
$90,000
Ìre II
Madison, WI13 Màrt 20252 Lùna 2025Dearbhaichte
$90,000
Ìre II
Madison, WI5 Dùbh 202318 Dùbh 2023Dearbhaichte
$90,000
Ìre II
Madison, WI29 Sult 20231 Samh 2023Dearbhaichte

Obraichean eile aig USM Business Sytems Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).