Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › V-Soft Consulting Group, INC › OBM (Monitoring) Engineer

OBM (Monitoring) Engineer aig V-Soft Consulting Group, INC: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd OBM (Monitoring) Engineer aig V-Soft Consulting Group, INC. Tuarastal bunasach meadhanach $124,500; leth meadhanach $109,000–$133,000.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$124,500
Leath mheadhanach nan tuarastalan$109,000–$133,000
Ceudail 10mh–90mh$96,400–$133,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$133,000
FY20251$116,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$116,000
Ìre II
Fremont, CA21 Cèit 202410 Ògmh 2024Dearbhaichte, an uair sin air a tharraing air ais
$116,000
Ìre II
Fremont, CA21 Cèit 202410 Ògmh 2024Air a tharraing air ais
$133,000
Ìre II
Fremont, CA5 Gibl 202312 Gibl 2023Dearbhaichte
$133,000
Ìre II
Fremont, CA21 Màrt 202328 Màrt 2023Dearbhaichte
$88,000
Ìre II
Mountain House, CA3 Samh 20229 Dùbh 2022Dearbhaichte
$88,000
Ìre II
Mountain House, CA1 Samh 20229 Samh 2022Air a tharraing air ais

Obraichean eile aig V-Soft Consulting Group, INC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).