Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Verkada, Inc › Sales Strategy and Operations Manager

Sales Strategy and Operations Manager aig Verkada, Inc: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Sales Strategy and Operations Manager aig Verkada, Inc. Tuarastal bunasach meadhanach $160,000; leth meadhanach $160,000–$170,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$160,000
Leath mheadhanach nan tuarastalan$160,000–$170,000
Ceudail 10mh–90mh$160,000–$173,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$160,000
FY20252$172,500

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$170,000–$220,000
Ìre III
San Mateo, CA9 Ògmh 20251 Dàmh 2025Dearbhaichte
$175,000–$195,000
Ìre III
San Mateo, CA12 Màrt 20257 Gibl 2025Dearbhaichte
$160,000–$190,000
Ìre IV
San Mateo, CA16 Lùna 20231 Dàmh 2023Dearbhaichte
$160,000–$190,000
Ìre IV
San Mateo, CA6 Ògmh 20231 Dàmh 2023Dearbhaichte
$160,000–$190,000
Ìre IV
San Mateo, CA12 Gibl 20231 Dàmh 2023Dearbhaichte

Obraichean eile aig Verkada, Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).