Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Virtusa Consulting Services PVT., LTD › Tech Ops Engineer 2

Tech Ops Engineer 2 aig Virtusa Consulting Services PVT., LTD: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Tech Ops Engineer 2 aig Virtusa Consulting Services PVT., LTD. Tuarastal bunasach meadhanach $104,285; leth meadhanach $94,125–$107,658.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$104,285
Leath mheadhanach nan tuarastalan$94,125–$107,658
Ceudail 10mh–90mh$88,800–$117,141

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$105,570
FY20243$95,500
FY20252$119,288

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$124,656
Ìre II
Irving, TX17 Gibl 202523 Gibl 2025Dearbhaichte
$113,920
Ìre II
Tampa, FL23 Faoi 202529 Faoi 2025Dearbhaichte
$103,000
Ìre II
Jersey City, NJ17 Cèit 202422 Cèit 2024Dearbhaichte
$95,500
Ìre II
Tampa, FL15 Gibl 202420 Gibl 2024Dearbhaichte
$90,000
Ìre II
Tampa, FL15 Samh 202320 Samh 2023Dearbhaichte
$105,570
Ìre II
Tampa, FL1 Lùna 20238 Lùna 2023Dearbhaichte
$105,570
Ìre II
Tampa, FL25 Iuch 20232 Lùna 2023Dearbhaichte, an uair sin air a tharraing air ais
$86,000
Ìre II
New Castle, DE4 Cèit 202317 Cèit 2023Dearbhaichte

Obraichean eile aig Virtusa Consulting Services PVT., LTD

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).