Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Virtusa Corporation › DB Administrator 3

DB Administrator 3 aig Virtusa Corporation: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd DB Administrator 3 aig Virtusa Corporation. Tuarastal bunasach meadhanach $119,350; leth meadhanach $114,500–$126,000.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$119,350
Leath mheadhanach nan tuarastalan$114,500–$126,000
Ceudail 10mh–90mh$104,471–$142,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$134,675
FY20243$105,000
FY20251$125,008
FY20263$126,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$140,000
Ìre III
Lake Mary, FL9 Ògmh 202616 Ògmh 2026Dearbhaichte
$126,000
Ìre III
Berkeley Heights, NJ20 Màrt 202627 Màrt 2026Dearbhaichte
$117,000
Ìre III
Westlake, TX7 Faoi 202614 Faoi 2026Dearbhaichte
$125,008
Ìre III
Jersey City, NJ30 Iuch 20256 Lùna 2025Dearbhaichte
$127,000
Ìre III
Tampa, FL13 Sult 202420 Sult 2024Air a tharraing air ais
$105,000
Ìre III
Tampa, FL28 Lùna 20244 Sult 2024Dearbhaichte
$114,500
Ìre III
Phoenix, AZ22 Iuch 202429 Iuch 2024Dearbhaichte
$102,357
Ìre III
Tampa, FL29 Gearr 202411 Màrt 2024Dearbhaichte
$150,000
Ìre III
Parsippany, NJ11 Sult 202320 Sult 2023Dearbhaichte
$119,350
Ìre III
Jersey City, NJ23 Gearr 20233 Màrt 2023Dearbhaichte

Obraichean eile aig Virtusa Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).