Dachaigh › Luchd-obrach › Vistaltech Inc › Software Development Engineer in Test
Software Development Engineer in Test aig Vistaltech Inc: Tuarastalan H-1B
8 iarrtasan cumhaichean-obrach airson an dreuchd Software Development Engineer in Test aig Vistaltech Inc. Tuarastal bunasach meadhanach $97,032; leth meadhanach $90,423–$108,233.
Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$97,032
Leath mheadhanach nan tuarastalan$90,423–$108,233
Ceudail 10mh–90mh$88,017–$117,880
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $95,160 |
| FY2024 | 4 | $102,981 |
| FY2025 | 1 | $105,997 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $105,997 Ìre II | Argyle, TX | 3 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $124,738 Ìre II | Baltimore, MD | 9 Lùna 2024 | 19 Lùna 2024 | Dearbhaichte |
| $86,590 Ìre II | Clive, IA | 26 Gearr 2024 | 11 Màrt 2024 | Dearbhaichte |
| $114,941 Ìre II | Owings Mills, MD | 26 Faoi 2024 | 5 Gearr 2024 | Dearbhaichte |
| $91,021–$160,000 Ìre II | Farmington Hills, MI | 20 Dùbh 2023 | 2 Faoi 2024 | Dearbhaichte |
| $88,629 Ìre II | San Antonio, TX | 30 Cèit 2023 | 12 Ògmh 2023 | Dearbhaichte |
| $95,160 Ìre II | Bloomington, IL | 12 Gibl 2023 | 1 Ògmh 2023 | Dearbhaichte |
| $98,904 Ìre II | Frisco, TX | 13 Dùbh 2022 | 20 Dùbh 2022 | Dearbhaichte |
Software Development Engineer in Test aig gach neach-fastaidh →
Obraichean eile aig Vistaltech Inc
- Software Engineer$101,306
- Programmer Analyst$77,418
- Senior Software Engineer$106,278
- Software Quality Assurance Analyst$91,374
- Project Manager$78,354
- IT Business Analyst$81,578
- Technical Sales Engineer$94,786
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).