Dachaigh › Luchd-obrach › W.W. Clyde & Co.
W.W. Clyde & Co.: Tuarastalan H-1B agus taic bhìosa
Chuir W.W. Clyde & Co. 13 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 13. Tuarastal meadhanach a chaidh a thabhann: $100,223.
A bheil W.W. Clyde & Co. a’ toirt taic do bhìosaichean H-1B?
Chuir W.W. Clyde & Co. 13 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 18 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Cost Estimator | 3 | $84,000 |
| Project Engineer | 2 | $81,500 |
| Deputy Project Manager | 2 | $100,223 |
| Senior Project Manager | 2 | $131,000 |
| Project Manager | 1 | $105,000 |
| Estimating takeoff technician lead | 1 | $72,500 |
| Project Manager II | 1 | $122,491 |
| Project Manager I | 1 | $113,400 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $78,000 |
| FY2024 | 4 | $100,223 |
| FY2026 | 6 | $122,019 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Senior Project Manager | $131,000 Ìre III | Mesa, AZ | 18 Ògmh 2026 | 18 Ògmh 2026 | Dearbhaichte |
| Project Manager I | $113,400 Ìre III | Apache Junction, AZ | 16 Ògmh 2026 | 30 Sult 2026 | Dearbhaichte |
| Senior Project Manager | $131,000 Ìre III | Mesa, AZ | 16 Ògmh 2026 | 17 Ògmh 2026 | Dearbhaichte |
| Project Manager II | $122,491 Ìre IV | Apache Junction, AZ | 9 Ògmh 2026 | 23 Dàmh 2026 | Dearbhaichte |
| Project Engineer | $85,000 Ìre II | Apache Junction, AZ | 20 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Cost Estimator | $121,547 Ìre IV | Apache Junction, AZ | 1 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Estimating takeoff technician lead | $72,500 Ìre II | Mesa, AZ | 14 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Deputy Project Manager | $100,223 Ìre II | Mesa, AZ | 24 Gibl 2024 | 2 Lùna 2024 | Dearbhaichte |
| Deputy Project Manager | $100,223 Ìre II | Mesa, AZ | 15 Gibl 2024 | 2 Lùna 2024 | Dearbhaichte |
| Project Manager | $105,000 Ìre II | Mesa, AZ | 8 Dàmh 2023 | 23 Dàmh 2023 | Dearbhaichte |
| Project Engineer | $78,000 Ìre I | Apache Junction, AZ | 3 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Cost Estimator | $84,000 Ìre II | Apache Junction, AZ | 3 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Cost Estimator | $52,000 Ìre I | Apache Junction, AZ | 3 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).