Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Ward & Burke Tunneling, Inc.

Ward & Burke Tunneling, Inc.: Tuarastalan H-1B agus taic bhìosa

Chuir Ward & Burke Tunneling, Inc. 7 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 7. Tuarastal meadhanach a chaidh a thabhann: $124,467.

Iarrtasan (LCAs)7
Dearbhaichte7
Seòladh an neach-fhastaidhColumbus, OH
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$124,467
Leath mheadhanach nan tuarastalan$98,311–$132,234
Ceudail 10mh–90mh$85,775–$164,000

A bheil Ward & Burke Tunneling, Inc. a’ toirt taic do bhìosaichean H-1B?

Chuir Ward & Burke Tunneling, Inc. 7 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 20 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Iarrtasan cairt uaine (PERM) aig Ward & Burke Tunneling, Inc.: 5 →

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Site Manager/Engineer3$124,467
Senior Site Manager/Engineer2$170,000
Project Design Engineer1$108,035
Site Engineer – Manager1$81,557

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$170,000
FY20254$116,251
FY20261$81,557

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Site Engineer – Manager$81,557–$85,000
Ìre II
Cincinnati, OH20 Cèit 20261 Dàmh 2026Dearbhaichte
Site Manager/Engineer$88,587–$90,000
Ìre II
Georgetown, TX3 Ògmh 20251 Dàmh 2025Dearbhaichte
Site Manager/Engineer$124,467–$130,000
Ìre IV
Georgetown, TX2 Ògmh 20251 Dàmh 2025Dearbhaichte
Site Manager/Engineer$124,467–$130,000
Ìre IV
Georgetown, TX23 Cèit 20251 Dàmh 2025Dearbhaichte, an uair sin air a tharraing air ais
Project Design Engineer$108,035–$130,000
Ìre III
Chula Vista, CA3 Gearr 202523 Cèit 2025Dearbhaichte
Senior Site Manager/Engineer$200,000
Ìre III
Columbus, OH30 Cèit 20231 Dàmh 2023Dearbhaichte
Senior Site Manager/Engineer$140,000
Ìre III
Columbus, OH11 Cèit 20231 Dàmh 2023Dearbhaichte

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).