Dachaigh › Luchd-obrach › Washington State Department of Transportation
Washington State Department of Transportation: Tuarastalan H-1B agus taic bhìosa
Chuir Washington State Department of Transportation 12 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 11. Tuarastal meadhanach a chaidh a thabhann: $86,000.
A bheil Washington State Department of Transportation a’ toirt taic do bhìosaichean H-1B?
Chuir Washington State Department of Transportation 12 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 7 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Transportation Engineer | 3 | $78,095 |
| IT Application Development “ Journey | 3 | $99,516 |
| IT App Development – Journey | 2 | $107,014 |
| Bridge Engineer 4 (In-training) | 1 | $70,632 |
| Planner, Transportation Specialist 3 (TPS3) | 1 | $85,020 |
| Bridge Engineer in Training | 1 | $86,000 |
| Vessel Project Engineer – Electrical System | 1 | $135,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $77,826 |
| FY2024 | 3 | $78,095 |
| FY2025 | 3 | $99,516 |
| FY2026 | 4 | $98,000 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Transportation Engineer | $85,000–$95,000 | Seattle, WA | 7 Gibl 2026 | 7 Ògmh 2026 | Dearbhaichte |
| Vessel Project Engineer – Electrical System | $135,000–$155,000 Ìre II | Seattle, WA | 27 Faoi 2026 | 20 Iuch 2026 | Dearbhaichte |
| Bridge Engineer in Training | $86,000–$106,000 Ìre I | Tumwater, WA | 26 Dùbh 2025 | 1 Ògmh 2026 | Dearbhaichte |
| IT App Development – Journey | $110,000–$125,000 | Tumwater, WA | 8 Dùbh 2025 | 18 Gibl 2026 | Dearbhaichte |
| IT Application Development “ Journey | $99,516–$109,516 | Seattle, WA | 31 Faoi 2025 | 16 Gearr 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| IT Application Development “ Journey | $99,516–$109,516 | Seattle, WA | 14 Faoi 2025 | 27 Faoi 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| IT Application Development “ Journey | $99,516–$109,516 | Seattle, WA | 13 Faoi 2025 | 27 Faoi 2025 | Air a tharraing air ais |
| Transportation Engineer | $78,095–$88,095 | Spokane, WA | 15 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Transportation Engineer | $74,376–$84,376 | Spokane, WA | 15 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| IT App Development – Journey | $104,028–$114,028 | Tumwater, WA | 19 Màrt 2024 | 13 Sult 2024 | Dearbhaichte |
| Planner, Transportation Specialist 3 (TPS3) | $85,020 | Seattle, WA | 18 Faoi 2023 | 16 Gearr 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Bridge Engineer 4 (In-training) | $70,632–$72,432 Ìre I | Tumwater, WA | 6 Cèit 2020 | 1 Dàmh 2020 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).