Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Western Alliance Bank › IT Supervisor II

IT Supervisor II aig Western Alliance Bank: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd IT Supervisor II aig Western Alliance Bank. Tuarastal bunasach meadhanach $126,665; leth meadhanach $117,111–$126,665.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$126,665
Leath mheadhanach nan tuarastalan$117,111–$126,665
Ceudail 10mh–90mh$115,274–$126,665

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$117,111
FY20251$114,050
FY20263$126,665

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$126,665
Ìre II
Bellevue, WA23 Faoi 20269 Gearr 2026Dearbhaichte
$126,665
Ìre I
Bellevue, WA20 Faoi 20269 Gearr 2026Dearbhaichte
$126,665
Ìre II
Bellevue, WA5 Samh 20259 Gearr 2026Dearbhaichte, an uair sin air a tharraing air ais
$114,050
Ìre II
Westlake Village, CA6 Cèit 20251 Dàmh 2025Dearbhaichte
$117,111
Ìre III
Redmond, WA10 Gearr 202320 Gearr 2023Dearbhaichte

Obraichean eile aig Western Alliance Bank

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).