Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Wipro Limited › Project Operations Lead L1

Project Operations Lead L1 aig Wipro Limited: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Project Operations Lead L1 aig Wipro Limited. Tuarastal bunasach meadhanach $125,663; leth meadhanach $110,420–$129,940.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$125,663
Leath mheadhanach nan tuarastalan$110,420–$129,940
Ceudail 10mh–90mh$89,513–$131,862

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$73,466
FY20243$131,144
FY20262$125,663

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$125,000
Ìre II
Irving, TX6 Gibl 20261 Dàmh 2026Dearbhaichte
$126,326
Ìre II
Redmond, WA12 Dùbh 20259 Faoi 2026Dearbhaichte
$105,560
Ìre II
Union City, CA2 Sult 20242 Sult 2024Dearbhaichte
$132,579
Ìre II
San Jose, CA12 Iuch 202412 Iuch 2024Dearbhaichte
$131,144
Ìre II
San Jose, CA26 Màrt 202426 Màrt 2024Dearbhaichte
$73,466
Ìre II
Redmond, WA9 Faoi 20239 Faoi 2023Dearbhaichte

Obraichean eile aig Wipro Limited

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).