Dachaigh › Luchd-obrach › Wipro Limited › VLSI Lead L1
VLSI Lead L1 aig Wipro Limited: Tuarastalan H-1B
20 iarrtasan cumhaichean-obrach airson an dreuchd VLSI Lead L1 aig Wipro Limited. Tuarastal bunasach meadhanach $125,992; leth meadhanach $105,794–$151,091.
Iarrtasan (LCAs)20
Tuarastal meadhanach a chaidh a thabhann$125,992
Leath mheadhanach nan tuarastalan$105,794–$151,091
Ceudail 10mh–90mh$95,431–$151,667
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $93,933 |
| FY2024 | 1 | $126,984 |
| FY2025 | 11 | $151,091 |
| FY2026 | 5 | $125,000 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $125,000 Ìre II | Austin, TX | 31 Màrt 2026 | 7 Gibl 2026 | Dearbhaichte |
| $128,250 Ìre II | Redmond, WA | 19 Faoi 2026 | 19 Faoi 2026 | Dearbhaichte |
| $110,656 Ìre II | Austin, TX | 30 Sult 2025 | 30 Sult 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $112,174 Ìre II | Dallas, TX | 4 Sult 2025 | 4 Sult 2025 | Dearbhaichte |
| $156,853 Ìre II | Sunnyvale, CA | 22 Iuch 2025 | 22 Iuch 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $156,853 Ìre II | Sunnyvale, CA | 16 Iuch 2025 | 16 Iuch 2025 | Dearbhaichte |
| $151,091 Ìre II | Sunnyvale, CA | 23 Cèit 2025 | 23 Cèit 2025 | Dearbhaichte |
| $108,160 Ìre II | Austin, TX | 9 Cèit 2025 | 9 Cèit 2025 | Dearbhaichte |
| $151,091 Ìre II | Mountain View, CA | 7 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $98,696 Ìre II | Hillsboro, OR | 7 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $151,091 Ìre II | Santa Clara, CA | 7 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $151,091 Ìre II | Santa Clara, CA | 4 Cèit 2025 | 4 Cèit 2025 | Dearbhaichte |
| $109,990 Ìre II | Redmond, WA | 27 Màrt 2025 | 27 Màrt 2025 | Dearbhaichte |
| $95,597 Ìre II | Novi, MI | 25 Gearr 2025 | 25 Gearr 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $95,597 Ìre II | Novi, MI | 4 Gearr 2025 | 4 Gearr 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $151,091 Ìre II | Sunnyvale, CA | 23 Faoi 2025 | 23 Faoi 2025 | Dearbhaichte |
| $126,984 Ìre II | Santa Clara, CA | 25 Ògmh 2024 | 25 Ògmh 2024 | Dearbhaichte |
| $126,984 Ìre II | Mountain View, CA | 29 Lùna 2023 | 29 Lùna 2023 | Dearbhaichte |
| $93,933 Ìre II | Novi, MI | 18 Gibl 2023 | 19 Gibl 2023 | Dearbhaichte |
| $93,933 Ìre II | Novi, MI | 10 Gibl 2023 | 10 Gibl 2023 | Dearbhaichte |
Obraichean eile aig Wipro Limited
- Technical Lead L1$85,218
- Techno Functional Consultant L2$91,562
- Solution Architect L1$86,400
- Project Manager L1$86,400
- Project Lead L1$84,219
- Application Architect L1$86,400
- Developer L3$80,725
- Technology Architect L1$86,400
- Developer L4$82,243
- Lead Engineer$80,122
- Techno Functional Consultant L1$95,257
- Lead Administrator L1$81,931
- Domain Consultant L3$86,400
- Techno Functional Consultant L3$112,372
- Program Manager L1$103,064
- Test Engineer L4$81,328
- Test Engineer L3$80,902
- Domain Consultant L2$82,847
- Solution Architect L2$109,886
- Project Manager L2$103,137
- Lead Administrator L2$86,400
- Domain Consultant L4$105,938
- Project Manager$86,400
- Architect Level 2$76,118
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).