Dachaigh › Luchd-obrach › WSP USA Buildings Inc. › Structural Engineer
Structural Engineer aig WSP USA Buildings Inc.: Tuarastalan H-1B
18 iarrtasan cumhaichean-obrach airson an dreuchd Structural Engineer aig WSP USA Buildings Inc.. Tuarastal bunasach meadhanach $92,934; leth meadhanach $85,530–$109,819.
Iarrtasan (LCAs)18
Tuarastal meadhanach a chaidh a thabhann$92,934
Leath mheadhanach nan tuarastalan$85,530–$109,819
Ceudail 10mh–90mh$83,225–$122,419
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $85,426 |
| FY2024 | 2 | $98,000 |
| FY2025 | 2 | $97,760 |
| FY2026 | 11 | $96,470 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $121,701 Ìre III | Los Angeles, CA | 12 Ògmh 2026 | 29 Ògmh 2026 | Dearbhaichte |
| $86,362 Ìre II | Portland, ME | 11 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $116,688 Ìre III | Boston, MA | 29 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $80,350 Ìre I | New York, NY | 29 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $83,262 Ìre I | Los Angeles, CA | 25 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $124,093 Ìre IV | Chicago, IL | 24 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $96,470 Ìre II | Los Angeles, CA | 24 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $91,333 Ìre II | Honolulu, HI | 24 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $84,614 Ìre I | Portland, ME | 24 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte, an uair sin air a tharraing air ais |
| $153,358 Ìre IV | New York, NY | 23 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $108,805 Ìre II | Los Angeles, CA | 1 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $92,414 Ìre II | Los Angeles, CA | 7 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $103,106 Ìre II | Denver, CO | 15 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $110,157 Ìre II | Los Angeles, CA | 3 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $85,842 Ìre II | Chicago, IL | 5 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $85,426 Ìre I | Los Angeles, CA | 12 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $93,454 Ìre II | Irvine, CA | 16 Màrt 2023 | 28 Lùna 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| $83,138 Ìre II | Chicago, IL | 2 Gearr 2023 | 1 Lùna 2023 | Dearbhaichte |
Structural Engineer aig gach neach-fastaidh →
Obraichean eile aig WSP USA Buildings Inc.
- Mechanical Engineer$101,379
- Electrical Engineer$95,014
- Associate Consultant, Electrical Engineer$83,106
- Associate Consultant, Mechanical Engineer$85,883
- Associate Consultant, Structural Engineer$86,112
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).