Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Zebra Technologies Corporation › Manager, Information Systems

Manager, Information Systems aig Zebra Technologies Corporation: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Manager, Information Systems aig Zebra Technologies Corporation. Tuarastal bunasach meadhanach $122,990; leth meadhanach $111,613–$131,966.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$122,990
Leath mheadhanach nan tuarastalan$111,613–$131,966
Ceudail 10mh–90mh$109,876–$132,434

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$110,344
FY20252$132,434
FY20261$130,562

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$130,562–$183,200
Ìre IV
Cumming, GA27 Gearr 20266 Màrt 2026Dearbhaichte
$132,434–$183,200
Ìre IV
Lincolnshire, IL9 Sult 20252 Gearr 2026Dearbhaichte
$132,434–$183,200
Ìre IV
Lincolnshire, IL28 Lùna 202525 Gearr 2026Dearbhaichte
$110,344–$175,129
Ìre IV
Lincolnshire, IL24 Màrt 20233 Lùna 2023Dearbhaichte
$115,419–$175,129
Ìre IV
Lincolnshire, IL13 Màrt 20231 Gibl 2023Dearbhaichte
$109,408–$175,129
Ìre IV
Lincolnshire, IL19 Dùbh 202214 Ògmh 2023Dearbhaichte

Obraichean eile aig Zebra Technologies Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).