Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Zimmer, Inc. › Development Senior Engineer I

Development Senior Engineer I aig Zimmer, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Development Senior Engineer I aig Zimmer, Inc.. Tuarastal bunasach meadhanach $89,446; leth meadhanach $86,336–$94,341.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$89,446
Leath mheadhanach nan tuarastalan$86,336–$94,341
Ceudail 10mh–90mh$78,902–$95,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$95,000
FY20242$86,399
FY20251$92,365

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$92,365
Ìre II
Warsaw, IN30 Sult 202428 Màrt 2025Dearbhaichte
$86,526
Ìre II
Fort Wayne, IN15 Gibl 20241 Dàmh 2024Dearbhaichte
$86,272
Ìre II
Warsaw, IN4 Màrt 202414 Màrt 2024Dearbhaichte
$71,531
Ìre II
Warsaw, IN10 Lùna 20231 Dàmh 2023Dearbhaichte
$95,000
Ìre II
Warsaw, IN6 Gibl 20231 Dàmh 2023Dearbhaichte
$95,000
Ìre II
Warsaw, IN29 Màrt 202328 Sult 2023Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig Zimmer, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).