Dachaigh › Cairtean uaine › BHP Minerals Service Company
BHP Minerals Service Company: sponsorachadh cairt uaine (PERM)
Chuir BHP Minerals Service Company 5 iarrtasan dearbhaidh obrach PERM a chaidh a dhearbhadh ann am bliadhnaichean ionmhais 2024–2026; dearbhte: 3. Tuarastal meadhanach tairgte $148,179; ùine mheadhanach bhon chur-a-steach chun dearbhadh: 455 làithean.
Tuarastalan H-1B aig BHP Minerals Service Company →
Tiotalan dreuchd
| Tiotal dreuchd | Iarrtasan PERM | Tuarastal meadhanach |
|---|---|---|
| Lead Project Controls & Analysis | 1 | $149,906 |
| Manager - Technical | 1 | — |
| Delivery Lead | 1 | $79,685 |
| Program Manager Tailings Mitigation | 1 | $148,179 |
| Principal Geotechnical Engineer | 1 | — |
Làraich obrach
Gnìomhan
Co-dhùnaidhean as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Air a cho-dhùnadh | Inbhe | Làithean |
|---|---|---|---|---|---|---|
| Program Manager Tailings Mitigation | $148,179 | Tucson, AZ | 12 Màrt 2025 | 19 Cèit 2026 | Dearbhte | 433 |
| Delivery Lead | $79,685 | Tucson, AZ | 3 Gearr 2025 | 4 Cèit 2026 | Dearbhte | 455 |
| Manager - Technical | $191,131 | Tucson, AZ | 23 Dùbh 2025 | 21 Gibl 2026 | Air a tharraing air ais | — |
| Lead Project Controls & Analysis | $149,906 | Tucson, AZ | 17 Lùna 2023 | 2 Dùbh 2024 | Dearbhte, a’ dol seachad | 473 |
| Principal Geotechnical Engineer | $109,242 | Tucson, AZ | 19 Dàmh 2023 | 1 Iuch 2024 | Air a tharraing air ais | — |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; bidh na staitistigean a’ cleachdadh iarrtasan làn-ùine teisteanasach. Is e teisteanas PERM aon cheum a dh’ionnsaigh caird-uaine; bidh USCIS a’ co-dhùnadh an ath-thagraidh. Chan e comhairle laghail a th’ ann. Stòr: Roinn Obrach nan SA, Dàta Foillseachaidh OFLC PERM, bliadhnaichean ionmhais 2024–2026 (co-dhùnadh as ùire 30 Ògmh 2026).