Dachaigh › Cairtean uaine › EMP SERV, LLC "Pipestone"
EMP SERV, LLC "Pipestone": sponsorachadh cairt uaine (PERM)
Chuir EMP SERV, LLC "Pipestone" 28 iarrtasan dearbhaidh obrach PERM a chaidh a dhearbhadh ann am bliadhnaichean ionmhais 2024–2026; dearbhte: 25. Tuarastal meadhanach tairgte $50,000; ùine mheadhanach bhon chur-a-steach chun dearbhadh: 473 làithean.
Tiotalan dreuchd
| Tiotal dreuchd | Iarrtasan PERM | Tuarastal meadhanach |
|---|---|---|
| Swine Lead | 13 | $50,000 |
| Site Manager | 13 | $66,498 |
| Regional Production Training Specialist | 2 | $66,498 |
Làraich obrach
Gnìomhan
- Farmers, Ranchers, and Other Agricultural Managers14
- Farmworkers, Farm, Ranch, and Aquacultural Animals13
Co-dhùnaidhean as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Air a cho-dhùnadh | Inbhe | Làithean |
|---|---|---|---|---|---|---|
| Site Manager | $66,498 | Pipestone, MN | 7 Samh 2023 | 21 Iuch 2025 | Dearbhte | 622 |
| Swine Lead | $50,000 | Pipestone, MN | 26 Dàmh 2023 | 7 Gibl 2025 | Dearbhte | 529 |
| Swine Lead | $50,000 | Pipestone, MN | 20 Dàmh 2023 | 7 Gibl 2025 | Dearbhte | 535 |
| Swine Lead | $50,000 | Pipestone, MN | 19 Dàmh 2023 | 7 Gibl 2025 | Dearbhte | 536 |
| Swine Lead | $50,000 | Pipestone, MN | 29 Sult 2023 | 8 Faoi 2025 | Dearbhte, a’ dol seachad | 467 |
| Swine Lead | $50,000 | Pipestone, MN | 26 Sult 2023 | 8 Faoi 2025 | Dearbhte, a’ dol seachad | 470 |
| Site Manager | $66,498 | Pipestone, MN | 26 Sult 2023 | 8 Faoi 2025 | Dearbhte, a’ dol seachad | 470 |
| Swine Lead | $50,000 | Pipestone, MN | 26 Sult 2023 | 8 Faoi 2025 | Dearbhte, a’ dol seachad | 470 |
| Swine Lead | $50,000 | Pipestone, MN | 22 Sult 2023 | 8 Faoi 2025 | Dearbhte, a’ dol seachad | 474 |
| Site Manager | $66,498 | Pipestone, MN | 22 Sult 2023 | 8 Faoi 2025 | Dearbhte, a’ dol seachad | 474 |
| Regional Production Training Specialist | $66,498 | Pipestone, MN | 21 Sult 2023 | 8 Faoi 2025 | Dearbhte, a’ dol seachad | 475 |
| Swine Lead | $50,000 | Pipestone, MN | 21 Sult 2023 | 8 Faoi 2025 | Dearbhte, a’ dol seachad | 475 |
| Regional Production Training Specialist | $66,498 | Pipestone, MN | 14 Sult 2023 | 8 Faoi 2025 | Dearbhte, a’ dol seachad | 482 |
| Swine Lead | $50,000 | Pipestone, MN | 14 Sult 2023 | 8 Faoi 2025 | Dearbhte, a’ dol seachad | 482 |
| Site Manager | $66,498 | Pipestone, MN | 22 Lùna 2023 | 19 Samh 2024 | Dearbhte, a’ dol seachad | 455 |
| Swine Lead | $50,000 | Pipestone, MN | 22 Lùna 2023 | 19 Samh 2024 | Dearbhte, a’ dol seachad | 455 |
| Site Manager | $66,498 | Pipestone, MN | 22 Lùna 2023 | 19 Samh 2024 | Dearbhte, a’ dol seachad | 455 |
| Swine Lead | $50,000 | Pipestone, MN | 21 Lùna 2023 | 19 Samh 2024 | Dearbhte, a’ dol seachad | 456 |
| Swine Lead | $50,000 | Pipestone, MN | 21 Lùna 2023 | 19 Samh 2024 | Dearbhte, a’ dol seachad | 456 |
| Site Manager | $66,498 | Pipestone, MN | 14 Lùna 2023 | 19 Samh 2024 | Dearbhte, a’ dol seachad | 463 |
| Site Manager | $66,498 | Pipestone, MN | 4 Lùna 2023 | 19 Samh 2024 | Dearbhte, a’ dol seachad | 473 |
| Site Manager | $66,498 | Pipestone, MN | 4 Lùna 2023 | 19 Samh 2024 | Dearbhte, a’ dol seachad | 473 |
| Site Manager | $66,498 | Pipestone, MN | 4 Lùna 2023 | 19 Samh 2024 | Dearbhte, a’ dol seachad | 473 |
| Swine Lead | $50,000 | Pipestone, MN | 4 Lùna 2023 | 19 Samh 2024 | Dearbhte, a’ dol seachad | 473 |
| Site Manager | $66,498 | Pipestone, MN | 4 Lùna 2023 | 19 Samh 2024 | Dearbhte, a’ dol seachad | 473 |
| Site Manager | $66,498 | Pipestone, MN | 14 Sult 2023 | 28 Dàmh 2024 | Air a tharraing air ais | — |
| Site Manager | $66,498 | Pipestone, MN | 21 Lùna 2023 | 28 Dàmh 2024 | Air a tharraing air ais | — |
| Site Manager | $66,498 | Pipestone, MN | 21 Lùna 2023 | 10 Samh 2023 | Air a tharraing air ais | — |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; bidh na staitistigean a’ cleachdadh iarrtasan làn-ùine teisteanasach. Is e teisteanas PERM aon cheum a dh’ionnsaigh caird-uaine; bidh USCIS a’ co-dhùnadh an ath-thagraidh. Chan e comhairle laghail a th’ ann. Stòr: Roinn Obrach nan SA, Dàta Foillseachaidh OFLC PERM, bliadhnaichean ionmhais 2024–2026 (co-dhùnadh as ùire 30 Ògmh 2026).