Dachaigh › Cairtean uaine › Leo O'laughlin, Inc.
Leo O'laughlin, Inc.: sponsorachadh cairt uaine (PERM)
Chuir Leo O'laughlin, Inc. 27 iarrtasan dearbhaidh obrach PERM a chaidh a dhearbhadh ann am bliadhnaichean ionmhais 2024–2026; dearbhte: 27. Tuarastal meadhanach tairgte $45,427; ùine mheadhanach bhon chur-a-steach chun dearbhadh: 496 làithean.
Tiotalan dreuchd
| Tiotal dreuchd | Iarrtasan PERM | Tuarastal meadhanach |
|---|---|---|
| Ready Mix Concrete and Heavy Haul Driver | 27 | $45,427 |
Làraich obrach
Gnìomhan
Co-dhùnaidhean as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Air a cho-dhùnadh | Inbhe | Làithean |
|---|---|---|---|---|---|---|
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 3 Màrt 2025 | Dearbhte, a’ dol seachad | 500 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 3 Màrt 2025 | Dearbhte, a’ dol seachad | 500 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 3 Màrt 2025 | Dearbhte, a’ dol seachad | 500 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 3 Màrt 2025 | Dearbhte, a’ dol seachad | 500 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 3 Màrt 2025 | Dearbhte, a’ dol seachad | 500 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 3 Màrt 2025 | Dearbhte, a’ dol seachad | 500 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 3 Màrt 2025 | Dearbhte, a’ dol seachad | 500 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 3 Màrt 2025 | Dearbhte, a’ dol seachad | 500 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 3 Màrt 2025 | Dearbhte, a’ dol seachad | 500 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 20 Dàmh 2023 | 27 Gearr 2025 | Dearbhte, a’ dol seachad | 496 |
| Ready Mix Concrete and Heavy Haul Driver | $45,427 | Shelbina, MO | 25 Sult 2023 | 8 Faoi 2025 | Dearbhte, a’ dol seachad | 471 |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; bidh na staitistigean a’ cleachdadh iarrtasan làn-ùine teisteanasach. Is e teisteanas PERM aon cheum a dh’ionnsaigh caird-uaine; bidh USCIS a’ co-dhùnadh an ath-thagraidh. Chan e comhairle laghail a th’ ann. Stòr: Roinn Obrach nan SA, Dàta Foillseachaidh OFLC PERM, bliadhnaichean ionmhais 2024–2026 (co-dhùnadh as ùire 30 Ògmh 2026).