Dachaigh › Cairtean uaine › Stucco Colors Design LLC
Stucco Colors Design LLC: sponsorachadh cairt uaine (PERM)
Chuir Stucco Colors Design LLC 42 iarrtasan dearbhaidh obrach PERM a chaidh a dhearbhadh ann am bliadhnaichean ionmhais 2024–2026; dearbhte: 32. Tuarastal meadhanach tairgte $33,280; ùine mheadhanach bhon chur-a-steach chun dearbhadh: 408 làithean.
Tiotalan dreuchd
| Tiotal dreuchd | Iarrtasan PERM | Tuarastal meadhanach |
|---|---|---|
| Construction Laborer | 39 | $33,280 |
| Receptionist | 3 | $29,250 |
Làraich obrach
Gnìomhan
Co-dhùnaidhean as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Air a cho-dhùnadh | Inbhe | Làithean |
|---|---|---|---|---|---|---|
| Construction Laborer | $57,554 | Bluffdale, UT | 27 Ògmh 2025 | 29 Ògmh 2026 | Dearbhte | 367 |
| Construction Laborer | $57,554 | Bluffdale, UT | 27 Ògmh 2025 | 29 Ògmh 2026 | Dearbhte | 367 |
| Construction Laborer | $57,554 | Bluffdale, UT | 27 Ògmh 2025 | 29 Ògmh 2026 | Dearbhte | 367 |
| Construction Laborer | $57,554 | Bluffdale, UT | 27 Ògmh 2025 | 29 Ògmh 2026 | Dearbhte | 367 |
| Construction Laborer | $57,554 | Bluffdale, UT | 27 Ògmh 2025 | 29 Ògmh 2026 | Dearbhte | 367 |
| Construction Laborer | $57,554 | Bluffdale, UT | 27 Ògmh 2025 | 29 Ògmh 2026 | Dearbhte | 367 |
| Construction Laborer | $32,000 | Bluffdale, UT | 15 Màrt 2024 | 14 Iuch 2025 | Dearbhte | 486 |
| Construction Laborer | $32,000 | Bluffdale, UT | 12 Màrt 2024 | 14 Iuch 2025 | Dearbhte | 489 |
| Construction Laborer | $32,000 | Bluffdale, UT | 12 Màrt 2024 | 14 Iuch 2025 | Dearbhte | 489 |
| Receptionist | $32,000 | Bluffdale, UT | 12 Màrt 2024 | 14 Iuch 2025 | Dearbhte | 489 |
| Construction Laborer | $32,000 | Bluffdale, UT | 12 Màrt 2024 | 14 Iuch 2025 | Dearbhte | 489 |
| Construction Laborer | $32,000 | Bluffdale, UT | 12 Màrt 2024 | 14 Iuch 2025 | Dearbhte | 489 |
| Construction Laborer | $32,000 | Bluffdale, UT | 12 Màrt 2024 | 14 Iuch 2025 | Dearbhte | 489 |
| Construction Laborer | $32,000 | Bluffdale, UT | 12 Màrt 2024 | 14 Iuch 2025 | Dearbhte | 489 |
| Construction Laborer | $32,000 | Bluffdale, UT | 12 Màrt 2024 | 14 Iuch 2025 | Dearbhte | 489 |
| Construction Laborer | $32,000 | Bluffdale, UT | 12 Màrt 2024 | 14 Iuch 2025 | Dearbhte | 489 |
| Construction Laborer | $32,000 | Bluffdale, UT | 11 Màrt 2024 | 14 Iuch 2025 | Dearbhte | 490 |
| Construction Laborer | $57,554 | Bluffdale, UT | 26 Ògmh 2025 | 27 Ògmh 2025 | Air a tharraing air ais | — |
| Construction Laborer | $57,554 | Bluffdale, UT | 26 Ògmh 2025 | 27 Ògmh 2025 | Air a tharraing air ais | — |
| Construction Laborer | $57,554 | Bluffdale, UT | 26 Ògmh 2025 | 27 Ògmh 2025 | Air a tharraing air ais | — |
| Construction Laborer | $57,554 | Bluffdale, UT | 25 Ògmh 2025 | 27 Ògmh 2025 | Air a tharraing air ais | — |
| Construction Laborer | $57,554 | Bluffdale, UT | 25 Ògmh 2025 | 27 Ògmh 2025 | Air a tharraing air ais | — |
| Construction Laborer | $57,554 | Bluffdale, UT | 25 Ògmh 2025 | 27 Ògmh 2025 | Air a tharraing air ais | — |
| Construction Laborer | $57,554 | Bluffdale, UT | 25 Ògmh 2025 | 26 Ògmh 2025 | Air a tharraing air ais | — |
| Construction Laborer | $57,554 | Bluffdale, UT | 25 Ògmh 2025 | 26 Ògmh 2025 | Air a tharraing air ais | — |
| Construction Laborer | $33,280 | Bluffdale, UT | 29 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 407 |
| Construction Laborer | $33,280 | Bluffdale, UT | 29 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 407 |
| Construction Laborer | $33,280 | Bluffdale, UT | 29 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 407 |
| Construction Laborer | $33,280 | Bluffdale, UT | 29 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 407 |
| Construction Laborer | $33,280 | Bluffdale, UT | 29 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 407 |
| Receptionist | $26,500 | Bluffdale, UT | 29 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 407 |
| Construction Laborer | $33,280 | Bluffdale, UT | 28 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 408 |
| Construction Laborer | $33,280 | Bluffdale, UT | 28 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 408 |
| Construction Laborer | $33,280 | Bluffdale, UT | 28 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 408 |
| Construction Laborer | $33,280 | Bluffdale, UT | 28 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 408 |
| Construction Laborer | $33,280 | Bluffdale, UT | 28 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 408 |
| Construction Laborer | $33,280 | Bluffdale, UT | 28 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 408 |
| Construction Laborer | $33,280 | Bluffdale, UT | 28 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 408 |
| Construction Laborer | $33,280 | Bluffdale, UT | 28 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 408 |
| Construction Laborer | $33,280 | Bluffdale, UT | 28 Ògmh 2023 | 9 Lùna 2024 | Dearbhte | 408 |
| Receptionist | $32,000 | Bluffdale, UT | 12 Màrt 2024 | 12 Màrt 2024 | Air a tharraing air ais | — |
| Construction Laborer | $32,000 | Bluffdale, UT | 12 Màrt 2024 | 12 Màrt 2024 | Air a tharraing air ais | — |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; bidh na staitistigean a’ cleachdadh iarrtasan làn-ùine teisteanasach. Is e teisteanas PERM aon cheum a dh’ionnsaigh caird-uaine; bidh USCIS a’ co-dhùnadh an ath-thagraidh. Chan e comhairle laghail a th’ ann. Stòr: Roinn Obrach nan SA, Dàta Foillseachaidh OFLC PERM, bliadhnaichean ionmhais 2024–2026 (co-dhùnadh as ùire 30 Ògmh 2026).