Dàta Tuarastail H-1B

Dachaigh › Cairtean uaine › Tror LLC

Tror LLC: sponsorachadh cairt uaine (PERM)

Chuir Tror LLC 10 iarrtasan dearbhaidh obrach PERM a chaidh a dhearbhadh ann am bliadhnaichean ionmhais 2024–2026; dearbhte: 7. Tuarastal meadhanach tairgte $92,000; ùine mheadhanach bhon chur-a-steach chun dearbhadh: 513 làithean.

Iarrtasan PERM10
Dearbhte7
Tuarastal meadhanach a chaidh a thabhann$92,000
Làithean meadhanach gu dearbhadh513
Mar-thà ag obair don neach-fastaidh80%
Luchd-obrach (mar a chaidh a chur a-steach)42
Ann an gnìomhachas bho2019
Seòladh an neach-fhastaidhSpring Hill, TN

Tuarastalan H-1B aig Tror LLC →

Tiotalan dreuchd

Tiotal dreuchdIarrtasan PERMTuarastal meadhanach
Software Engineer3$92,000
Solutions Developer2—
QA Test Engineer2$99,000
Technical Lead1—
Data Engineer1$92,000
DevOps Engineer1$99,000

Làraich obrach

Gnìomhan

Co-dhùnaidhean as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachAir a cho-dhùnadhInbheLàithean
QA Test Engineer$99,000Spring Hill, TN7 Màrt 202518 Ògmh 2026Dearbhte468
QA Test Engineer$99,000Spring Hill, TN13 Gearr 20257 Cèit 2026Dearbhte448
DevOps Engineer$99,000Spring Hill, TN12 Gearr 20257 Cèit 2026Dearbhte449
Solutions Developer$141,000Spring Hill, TN12 Gearr 202619 Gearr 2026Air a tharraing air ais—
Solutions Developer$141,000Spring Hill, TN4 Gearr 202619 Gearr 2026Air a tharraing air ais—
Data Engineer$92,000Spring Hill, TN12 Sult 20247 Gearr 2026Dearbhte513
Software Engineer$92,000Spring Hill, TN2 Lùna 20248 Faoi 2026Dearbhte524
Software Engineer$92,000Spring Hill, TN2 Lùna 20248 Faoi 2026Dearbhte524
Software Engineer$92,000Spring Hill, TN2 Lùna 20247 Faoi 2026Dearbhte523
Technical Lead$131,500Spring Hill, TN26 Ògmh 20245 Lùna 2025Air a tharraing air ais—

Salaries are the lower end of the wage offered on each application, converted to a yearly amount; statistics use certified full-time applications. PERM certification is one step toward a green card; USCIS decides the petition. Not legal advice. Source: U.S. Department of Labor, OFLC PERM Disclosure Data, fiscal years 2024–2026 (latest decision 30 Ògmh 2026).